Difference between revisions of "RGM RC Meeting Dec15 Dec22"
Jump to navigation
Jump to search
Line 26: | Line 26: | ||
* Last 24 hours | * Last 24 hours | ||
** Production running on LD2 with 50 nA (about 400 M events collected) | ** Production running on LD2 with 50 nA (about 400 M events collected) | ||
− | ** Change target from LD2 to LHe4 | + | ** 0:30 Torus power supply communication problem (did not affect data taking) |
− | ** Production running on LHe4 with 60 nA | + | ** About 2.5 hours no beam during owl shift |
+ | ** 7:30 Change target from LD2 to LHe4 | ||
+ | ** 10:45 Beam set up and beam blocker calibration | ||
+ | ** 12:00 Production running on LHe4 with 60 nA | ||
* Issues | * Issues | ||
** Ongoing: FMT layer 3 with missing strips (maybe hardware issue) | ** Ongoing: FMT layer 3 with missing strips (maybe hardware issue) |
Revision as of 14:12, 17 December 2021
Wednesday, December 15, 2021
- RC Hand-Off at 14:00
- Last 24 hours
- Target change to LD2, beam available around 22:00
- Production running started around 2:00
- Torus cryo communication issue at 3:20, continued data taking
- Cryo alarm was cleared by engineering
- Issues
- FMT layer 3 with missing strips (maybe hardware issue)
- Upcoming Plan
- Target change is scheduled for Friday at 7:30: LD2 --> LHe
- Analysis
Thursday, December 16, 2021
- Last 24 hours
- Production running on LD2 with 50 nA
- About 600 M events collected
- Issues
- Ongoing: FMT layer 3 with missing strips (maybe hardware issue)
- Upcoming Plan
- Target change is scheduled for Friday at 7:30: LD2 --> LHe
- Expect to ask for beam between 12:00 and 16:00
- Analysis
Friday, December 17, 2021
- Last 24 hours
- Production running on LD2 with 50 nA (about 400 M events collected)
- 0:30 Torus power supply communication problem (did not affect data taking)
- About 2.5 hours no beam during owl shift
- 7:30 Change target from LD2 to LHe4
- 10:45 Beam set up and beam blocker calibration
- 12:00 Production running on LHe4 with 60 nA
- Issues
- Ongoing: FMT layer 3 with missing strips (maybe hardware issue)
- Upcoming Plan
- Data taking with 60 nA on LHe4 target
- Analysis