Difference between revisions of "RGM RC Meeting Jan26 Feb2"
Jump to navigation
Jump to search
(Created page with "== Tuesday, Feb 1, 2022 == '''Short Term Schedule''' * status: 6GeV beam, LAr target is full, Beam blocker is OUT * Note to self: Presently, the alarm limit for the <font c...") |
|||
(2 intermediate revisions by the same user not shown) | |||
Line 8: | Line 8: | ||
** Needs to be restored to 'normal' value for the solid targets where we need to run with the beam blocker IN. | ** Needs to be restored to 'normal' value for the solid targets where we need to run with the beam blocker IN. | ||
− | * running: 25nA LAr until | + | * running: 25nA LAr until today, Tuesday 8pm |
+ | * empty LAr target | ||
− | * | + | * 1 hour empty target run |
− | ** single tin foil for | + | ** beam blocker calibration |
− | ** Ca48 target, beam blocker IN | + | |
+ | * single tin (200 mg/cm2) foil for 36 hours, beam blocker IN | ||
+ | ** have lumi scan for multiple foil tin, had 90 nA | ||
+ | ** beam blocker calibration | ||
+ | |||
+ | * tomorrow, Wednesday morning warm up LAr target to room temp | ||
+ | |||
+ | * Thursday 8am install Ca target | ||
+ | |||
+ | * Ca48 target (240 mg/cm2), beam blocker IN | ||
statistics: | statistics: | ||
+ | |||
+ | [[File:Screenshot from 2022-02-01 13-44-30.png]] |
Latest revision as of 16:47, 1 February 2022
Tuesday, Feb 1, 2022
Short Term Schedule
- status: 6GeV beam, LAr target is full, Beam blocker is OUT
- Note to self: Presently, the alarm limit for the beam_stopper_alarm is raised for running without beam blocker .
- Needs to be restored to 'normal' value for the solid targets where we need to run with the beam blocker IN.
- running: 25nA LAr until today, Tuesday 8pm
- empty LAr target
- 1 hour empty target run
- beam blocker calibration
- single tin (200 mg/cm2) foil for 36 hours, beam blocker IN
- have lumi scan for multiple foil tin, had 90 nA
- beam blocker calibration
- tomorrow, Wednesday morning warm up LAr target to room temp
- Thursday 8am install Ca target
- Ca48 target (240 mg/cm2), beam blocker IN
statistics: