Difference between revisions of "RGM RC Meeting Jan26 Feb2"
Jump to navigation
Jump to search
Line 9: | Line 9: | ||
* running: 25nA LAr until today, Tuesday 8pm | * running: 25nA LAr until today, Tuesday 8pm | ||
+ | * empty LAr target | ||
+ | |||
+ | * 1 hour empty target run | ||
+ | ** beam blocker calibration | ||
* single tin (200 mg/cm2) foil for 36 hours, beam blocker IN | * single tin (200 mg/cm2) foil for 36 hours, beam blocker IN | ||
** have lumi scan for multiple foil tin, had 90 nA | ** have lumi scan for multiple foil tin, had 90 nA | ||
** beam blocker calibration | ** beam blocker calibration | ||
− | |||
− | |||
* tomorrow, Wednesday morning warm up LAr target to room temp | * tomorrow, Wednesday morning warm up LAr target to room temp |
Latest revision as of 17:47, 1 February 2022
Tuesday, Feb 1, 2022
Short Term Schedule
- status: 6GeV beam, LAr target is full, Beam blocker is OUT
- Note to self: Presently, the alarm limit for the beam_stopper_alarm is raised for running without beam blocker .
- Needs to be restored to 'normal' value for the solid targets where we need to run with the beam blocker IN.
- running: 25nA LAr until today, Tuesday 8pm
- empty LAr target
- 1 hour empty target run
- beam blocker calibration
- single tin (200 mg/cm2) foil for 36 hours, beam blocker IN
- have lumi scan for multiple foil tin, had 90 nA
- beam blocker calibration
- tomorrow, Wednesday morning warm up LAr target to room temp
- Thursday 8am install Ca target
- Ca48 target (240 mg/cm2), beam blocker IN
statistics: