Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 101: | Line 101: | ||
* The <b> main lights in the Hall </b> (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights, when switched off, cannot be turned back on immediately because they require 10-15 min to cool down. | * The <b> main lights in the Hall </b> (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights, when switched off, cannot be turned back on immediately because they require 10-15 min to cool down. | ||
− | * Do not run more than 30 minutes above 30 nA with a 5-pass beam without the <b> beam blocker in front of the Faraday cup </b>. Put beam blocker in for long-running at high currents for 5-pass operations. | + | * Do not run more than 30 minutes above 30 nA with a 5-pass beam without the <b> beam blocker in front of the Faraday cup </b>. Put beam blocker in for long-running at high currents for 5-pass operations. (<font color=red> Is this still relevant?</font>) |
* Turn <b> DC HV </b> off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. | * Turn <b> DC HV </b> off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. | ||
* With any issue, contact On-Call Experts or RC - <b> do not spend more than 15-20 min trying to fix the problem</b>. If the phone is not answered, try the "Page Experts" button on top of CLASCSS. | * With any issue, contact On-Call Experts or RC - <b> do not spend more than 15-20 min trying to fix the problem</b>. If the phone is not answered, try the "Page Experts" button on top of CLASCSS. |
Revision as of 14:03, 8 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 15:30: CH Room 200C, and on Zoom: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
LE: Please don't change: Work in progress
Short-Term Schedule for the Week from Sept 13th to Sept. 20th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C
Harp Scan References from RG-C |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|