Line 28: | Line 28: | ||
== Short-Term Schedule for the Week from '''Sept 13th to Sept. 20th''', 2023 == | == Short-Term Schedule for the Week from '''Sept 13th to Sept. 20th''', 2023 == | ||
* '''Wednesday, Sept. 13th''': shifts are canceled due to the target work and/or MCC beam/maintenance studies. | * '''Wednesday, Sept. 13th''': shifts are canceled due to the target work and/or MCC beam/maintenance studies. | ||
− | * '''Thursday, Sept. 14th''': The current plan is to lock | + | * '''Thursday, Sept. 14th''': The current plan is to lock up the hall in the day shift and start tunning the beam to the tagger dump in the swing/owl shift. |
* '''Friday, Sept. 15th''': | * '''Friday, Sept. 15th''': | ||
** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Moller run with new quadrupole power supply and tagger ramping/degaussing; <font color=red>Does Eugene (or another beamline expert?) need to be consulted for this? </font> | ** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Moller run with new quadrupole power supply and tagger ramping/degaussing; <font color=red>Does Eugene (or another beamline expert?) need to be consulted for this? </font> | ||
Line 48: | Line 48: | ||
** '''Coarse Luminosity Scan''': | ** '''Coarse Luminosity Scan''': | ||
*** This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents: | *** This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents: | ||
− | **** Ask MCC for 5 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. The | + | **** Ask MCC for 5 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. The random prescale factor needs to be decreased. <font color=red>''Who should be notified about that, and for which beam current it should increase back? </font>; <font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> |
* '''Saturday, Sept. 16th''': | * '''Saturday, Sept. 16th''': | ||
** '''Luminosity Scan''': | ** '''Luminosity Scan''': | ||
− | *** Continue the study | + | *** Continue the study for the following beam currents: |
**** Whenever the 5 nA run is done, ask MCC for 10 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | **** Whenever the 5 nA run is done, ask MCC for 10 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ||
**** Ask MCC for 25 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | **** Ask MCC for 25 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. |
Revision as of 15:05, 8 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 15:30: CH Room 200C, and on Zoom: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
LE: Please don't change: Work in progress
Short-Term Schedule for the Week from Sept 13th to Sept. 20th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C
Harp Scan References from RG-C |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|