Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 57: | Line 57: | ||
**** Ask MCC for 50 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | **** Ask MCC for 50 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ||
**** Once done, we could perform a high-current luminosity scan (''to-be-revised based on the feedback''). If so, ask MCC for: | **** Once done, we could perform a high-current luminosity scan (''to-be-revised based on the feedback''). If so, ask MCC for: | ||
− | ***** 75 nA and take a | + | ***** 75 nA and take a 50 M run with the '''TBD''' inbending e- trigger with no-DC-roads. |
− | ***** 100 nA and take a | + | ***** 100 nA and take a 50 M run with the '''TBD''' inbending e- trigger with no-DC-roads. <font color=red>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease. Would that work? </font> |
+ | |||
+ | * '''Target Changeover''': | ||
+ | ** Denny/the target group (''TBD'') needs to be called ahead of time | ||
Revision as of 16:23, 8 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 15:30: CH Room 200C, and on Zoom: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
LE: Please don't change: Work in progress
Short-Term Schedule for the Week from Sept 13th to Sept. 20th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C
Harp Scan References from RG-C |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|