Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 59: | Line 59: | ||
***** 75 nA and take a 50 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ***** 75 nA and take a 50 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ||
***** 100 nA and take a 50 M run with the '''TBD''' inbending e- trigger with no-DC-roads. <font color=red>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease. Would that work? </font> | ***** 100 nA and take a 50 M run with the '''TBD''' inbending e- trigger with no-DC-roads. <font color=red>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease. Would that work? </font> | ||
− | + | ** Once done, Valery should be called to change the RICH to a high threshold setting, then take a 100 M electron trigger run with 35 nA (~ 4h run). <font color=red>''Please, Valery, advise whether you want to take this run now with no-DC-roads, assuming all other subsystems will be at their nominal settings!''</font>) | |
+ | ** Once done, the RICH setting can be reverted. '''Valery may need to be contacted again'''. Continue LD2 data-taking with 35 nA and 100 M runs until the end of the shift.<font color=blue><center>---''If everything goes well, that should bring us to the Swing shift'' ---</font></center> | ||
* '''Target Changeover''': | * '''Target Changeover''': | ||
** Denny/the target group (''TBD'') needs to be called ahead of time to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h. | ** Denny/the target group (''TBD'') needs to be called ahead of time to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h. | ||
− | ** Put the flag assembly in the C+C target configuration, then ask MCC for 30 nA and take 1/2h run with the '''TBD''' inbending e- trigger with no-DC-roads. | + | ** Put the flag assembly in the C+C target configuration, then ask MCC for 30 nA and take 1/2h run with the '''TBD''' inbending e- trigger with no-DC-roads. |
** '''Solid-target Luminosity Scans''': | ** '''Solid-target Luminosity Scans''': | ||
*** '''C+C target configuration''': | *** '''C+C target configuration''': | ||
Line 76: | Line 77: | ||
**** Ask MCC for 120 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | **** Ask MCC for 120 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ||
**** Ask MCC for 130 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | **** Ask MCC for 130 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ||
− | **** Ask MCC for 150 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. <font color=blue><center> | + | **** Ask MCC for 150 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. <font color=blue><center>---''If everything goes well, the Owl shift should start somewhere in between the listed Cu+Sn luminosity scan runs!'' ---</font></center> |
* '''Sunday, Sept. 17th''': | * '''Sunday, Sept. 17th''': | ||
− | ** If the Owl shift starts with an ongoing luminosity scan, please continue the study | + | ** If the Owl shift starts with an ongoing luminosity scan for Cu+Sn, please continue the study to complete the listed beam current runs. |
− | ** Assuming the MD | + | ** Once done, ask for 130 nA and take 100 M runs of Cu+Sn until the end of the shift. |
+ | ** By the beginning of the day shift, change the target to C+C | ||
+ | Assuming the MD | ||
<!-- | <!-- |
Revision as of 19:15, 8 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 15:30: CH Room 200C, and on Zoom: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
LE: Please don't change: Work in progress
Short-Term Schedule for the Week from Sept 13th to Sept. 20th, 2023
Assuming the MD
DAQ configuration
Reference ValuesFSD Thresholds from RG-C
Harp Scan References from RG-C |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|