Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 44: | Line 44: | ||
*** ''All runs will be taken with the e- trigger without DC-roads until the trigger roads are validated by the trigger team.''. | *** ''All runs will be taken with the e- trigger without DC-roads until the trigger roads are validated by the trigger team.''. | ||
**** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
− | ***Ask MCC for 45 nA beam current and take 5 hours runs with | + | ***Ask MCC for 45 nA beam current and take approximately 5 hours runs with 4 DC HV settings. A total of 120 M electron triggers is needed for this study; two HV settings with 50 M each and the other two with 10 M each. '''Florian needs to be called to change the DC HV and confirm the statistics needed'''. |
− | ***Take 1.5-hour run with just EPICS, no DAQ. '''Florian needs to be | + | <!--font color=red>''I can't access Florian's table in Nathan's shared RG-D Special Runs document. Please, Florian, advise what needs to be specified here!''</font--> |
+ | ***Take 1.5-hour run with just EPICS, no DAQ. '''Florian needs to be notified to be present in the CR during this run'''. | ||
*** Parasitically, 50 M electron triggers are needed for the TOF gain calibration <!--font color=red>''Please, Daniel, advise whether you need to be contacted for any specific setup for this run!''</font--> | *** Parasitically, 50 M electron triggers are needed for the TOF gain calibration <!--font color=red>''Please, Daniel, advise whether you need to be contacted for any specific setup for this run!''</font--> | ||
*** Parasitically, the same data can be used to conduct a linearity study for the new ECAL sector 5 PMTs. '''Cole needs to be consulted'''. (<font color=red>'' Please, Cole, advise what needs to be specified here!''</font>) | *** Parasitically, the same data can be used to conduct a linearity study for the new ECAL sector 5 PMTs. '''Cole needs to be consulted'''. (<font color=red>'' Please, Cole, advise what needs to be specified here!''</font>) | ||
Line 95: | Line 96: | ||
*** ''Trigger file'': '''rgd_250MeV_v1.0_zero.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | *** ''Trigger file'': '''rgd_250MeV_v1.0_zero.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
<!--font color=red> Please, Yuri, advise whether you need to be contacted to set anything for the parasitic CVT alignment </font--> | <!--font color=red> Please, Yuri, advise whether you need to be contacted to set anything for the parasitic CVT alignment </font--> | ||
− | * '''Monday, Sept. | + | * '''Monday, Sept. 25th''': |
** MCC maintenance/beam studies during the day shift (''TBC'')! | ** MCC maintenance/beam studies during the day shift (''TBC'')! | ||
<!-- | <!-- |
Revision as of 22:45, 11 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Short-Term Schedule for the Week from Sept. 22nd to Sept. 25th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|