Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 48: | Line 48: | ||
***Take 1.5-hour run with just EPICS, no DAQ. '''Florian needs to be notified to be present in the CR during this run'''. | ***Take 1.5-hour run with just EPICS, no DAQ. '''Florian needs to be notified to be present in the CR during this run'''. | ||
*** Parasitically, 50 M electron triggers are needed for the TOF gain calibration <!--font color=red>''Please, Daniel, advise whether you need to be contacted for any specific setup for this run!''</font--> | *** Parasitically, 50 M electron triggers are needed for the TOF gain calibration <!--font color=red>''Please, Daniel, advise whether you need to be contacted for any specific setup for this run!''</font--> | ||
− | *** Parasitically, the same data can be used to conduct a linearity study for the new ECAL | + | *** Parasitically, the same data can be used to conduct a linearity study for the new ECAL PMTs. |
** '''Coarse Luminosity Scan''': | ** '''Coarse Luminosity Scan''': | ||
*** This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents and the same electron trigger without DC roads: | *** This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents and the same electron trigger without DC roads: | ||
Line 98: | Line 98: | ||
* '''Monday, Sept. 25th''': | * '''Monday, Sept. 25th''': | ||
** MCC maintenance/beam studies during the day shift (''TBC'')! | ** MCC maintenance/beam studies during the day shift (''TBC'')! | ||
+ | *** After establishing the beam in the swing shift on the outbending configuration, another 50 M run should be taken upon Cole's request for the ECAL calibration: | ||
+ | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
<!-- | <!-- | ||
* In-bending torus field, 5-pass beam on ND3. | * In-bending torus field, 5-pass beam on ND3. |
Revision as of 20:33, 12 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Short-Term Schedule for the Week from Sept. 22nd to Sept. 25th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|