Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 52: | Line 52: | ||
*** This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents and the same electron trigger without DC roads: | *** This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents and the same electron trigger without DC roads: | ||
**** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
− | **** Ask MCC for 5 nA and take a 5 M run. The random prescale factor needs to be decreased. <font color=red>''Who should be notified about that, and for which beam current it should increase back? </font> <font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> | + | **** Ask MCC for 5 nA and take a 5 M triggers run. The random prescale factor needs to be decreased. <font color=red>''Who should be notified about that, and for which beam current it should increase back? </font> <font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> |
* '''Saturday, Sept. 23rd''': | * '''Saturday, Sept. 23rd''': | ||
** '''Luminosity Scan''': | ** '''Luminosity Scan''': | ||
*** Continue the study for the following beam currents and the same electron trigger without DC roads: | *** Continue the study for the following beam currents and the same electron trigger without DC roads: | ||
**** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
− | **** Whenever the 5 nA run is done, ask MCC for 10 nA and take a 5 M run. | + | **** Whenever the 5 nA run is done, ask MCC for 10 nA and take a 5 M triggers run. |
**** Ask MCC for 25 nA and take a 5 M triggers run. | **** Ask MCC for 25 nA and take a 5 M triggers run. | ||
**** Ask MCC for 35 nA and take a 5 M triggers run. <font color=blue><center>-------- ''If everything goes well, the Day shift should start somewhere in between these runs!'' -------</font></center> | **** Ask MCC for 35 nA and take a 5 M triggers run. <font color=blue><center>-------- ''If everything goes well, the Day shift should start somewhere in between these runs!'' -------</font></center> | ||
**** Ask MCC for 50 nA and take a 5 M triggers run. | **** Ask MCC for 50 nA and take a 5 M triggers run. | ||
**** Once done, we could perform a high-current luminosity scan (''to-be-revised based on the feedback''). If so, ask MCC for: | **** Once done, we could perform a high-current luminosity scan (''to-be-revised based on the feedback''). If so, ask MCC for: | ||
− | ***** 75 nA and take a 50 M run. | + | ***** 75 nA and take a 50 M triggers run. |
− | ***** 100 nA and take a 50 M run. <font color=red>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease. Would that work? </font> | + | ***** 100 nA and take a 50 M triggers run. <font color=red>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease. Would that work? </font> |
** Once done, Valery should be called to change the RICH to a high threshold setting, then take a 100 M electron trigger run with 35 nA (~ 4h run). <font color=red>''Please, Valery, advise whether you want to take this run now with no-DC-roads, assuming all other subsystems will be at their nominal settings!''</font>) | ** Once done, Valery should be called to change the RICH to a high threshold setting, then take a 100 M electron trigger run with 35 nA (~ 4h run). <font color=red>''Please, Valery, advise whether you want to take this run now with no-DC-roads, assuming all other subsystems will be at their nominal settings!''</font>) | ||
− | ** Once done, the RICH setting can be reverted. '''Valery may need to be contacted again'''. Continue LD2 data-taking with 35 nA and 100 M runs until the end of the shift.<font color=blue><center>---''If everything goes well, that should bring us to the Swing shift'' ---</font></center> | + | ** Once done, the RICH setting can be reverted. '''Valery may need to be contacted again'''. Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the shift.<font color=blue><center>---''If everything goes well, that should bring us to the Swing shift'' ---</font></center> |
* '''Target Changeover''': | * '''Target Changeover''': | ||
** Denny/the target group (''TBD'') needs to be called ahead of time to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h. | ** Denny/the target group (''TBD'') needs to be called ahead of time to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h. | ||
Line 98: | Line 98: | ||
* '''Monday, Sept. 25th''': | * '''Monday, Sept. 25th''': | ||
** MCC maintenance/beam studies during the day shift (''TBC'')! | ** MCC maintenance/beam studies during the day shift (''TBC'')! | ||
− | *** After establishing the beam in the swing shift on the outbending configuration, another 50 M run | + | *** After establishing the beam in the swing shift on the outbending configuration, take first a Moller run. |
+ | *** Take another 50 M triggers run for the ECAL calibration upon Cole's request : | ||
**** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
<!-- | <!-- |
Revision as of 13:58, 13 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 22nd to Sept. 25th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|