Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 111: | Line 111: | ||
== <font color=blue> DAQ configuration </font> == | == <font color=blue> DAQ configuration </font> == | ||
− | * '''Configuration''' is <tt>'''PROD66'''</tt> or <tt>'''PROD66_PIN'''</tt> for | + | * '''Configuration''' is <tt>'''PROD66'''</tt> or <tt>'''PROD66_PIN'''</tt> for fast reconstruction/processing of commissioning/reference runs from Cache disk. |
* <tt>Trigger file: '''rgd_250MeV_v1.0_no_DC.trg''' with no-DC-roads</tt> for the first commissioning studies while e- trigger is being validated. | * <tt>Trigger file: '''rgd_250MeV_v1.0_no_DC.trg''' with no-DC-roads</tt> for the first commissioning studies while e- trigger is being validated. | ||
* '''NOTE''': UNLESS a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run to make a RICH recovery - instead, do this in between runs. | * '''NOTE''': UNLESS a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run to make a RICH recovery - instead, do this in between runs. |
Revision as of 18:36, 13 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 22nd to Sept. 25th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|