Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 35: | Line 35: | ||
** '''Trigger validation''': | ** '''Trigger validation''': | ||
*** Call MCC and ask for 35 nA and take 4 hours LD2 target run with a ''30 kHz random trigger'' to validate electron trigger; | *** Call MCC and ask for 35 nA and take 4 hours LD2 target run with a ''30 kHz random trigger'' to validate electron trigger; | ||
− | **** ''Trigger file'': '''rgd_250MeV_v1.0_30kHz.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | + | **** ''DAQ Config.'': <tt>PROD66_PIN</tt> |
+ | ***** ''Trigger file'': '''rgd_250MeV_v1.0_30kHz.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
*** Take one-hour LD2 run with e- trigger with ''no-DC-roads'' to validate the trigger roads. | *** Take one-hour LD2 run with e- trigger with ''no-DC-roads'' to validate the trigger roads. | ||
− | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | + | **** ''DAQ Config.'': <tt>PROD66_PIN</tt> |
+ | ***** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
** '''Parasitic studies''': | ** '''Parasitic studies''': | ||
*** When it's convenient, perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA while starting the random trigger run. The process should take 5 to 7 min at max. | *** When it's convenient, perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA while starting the random trigger run. The process should take 5 to 7 min at max. |
Revision as of 18:41, 14 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 22nd to Sept. 25th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|