Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 68: | Line 68: | ||
*** Once done and based on Valery/Marco M.'s instructions, the RICH threshold setting should be changed, then take a ''100 M electron trigger run with 35 nA for the given settings''. <font color=blue><center>-------- ''If everything goes well, the Day shift should start somewhere in between these runs!'' -------</font></center> | *** Once done and based on Valery/Marco M.'s instructions, the RICH threshold setting should be changed, then take a ''100 M electron trigger run with 35 nA for the given settings''. <font color=blue><center>-------- ''If everything goes well, the Day shift should start somewhere in between these runs!'' -------</font></center> | ||
<!--font color=red>''Please, Valery, advise whether you want to take this run now with no-DC-roads, assuming all other subsystems will be at their nominal settings!''</font--> | <!--font color=red>''Please, Valery, advise whether you want to take this run now with no-DC-roads, assuming all other subsystems will be at their nominal settings!''</font--> | ||
− | *** Once done, the RICH setting can be reverted to ''the nominal setting''. Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the shift. | + | *** Once done, the RICH setting can be reverted to ''the nominal setting''. Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the shift but change the DAQ configuration to: |
+ | **** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change configurations while keeping the same trigger file</font>. | ||
** '''Target Changeover''': | ** '''Target Changeover''': | ||
*** Denny/the target group (''TBD'') needs to be called ahead of time to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h.<font color=blue><center>---''If everything goes well, that should bring us to the Swing shift'' ---</font></center> | *** Denny/the target group (''TBD'') needs to be called ahead of time to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h.<font color=blue><center>---''If everything goes well, that should bring us to the Swing shift'' ---</font></center> | ||
− | *** Put the flag assembly in the | + | *** Put the flag assembly in the '''CxC''' target configuration, then ask MCC for 30 nA and take a 1/2h run with the same electron trigger without DC roads: |
− | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | + | **** ''DAQ Config.'': <tt>PROD66_PIN</tt> |
+ | ***** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
** '''Solid-target Luminosity Scans''': | ** '''Solid-target Luminosity Scans''': | ||
− | *** ''' | + | *** '''CxC target configuration''': |
**** Ask MCC for 10 nA and take a 5 M triggers run. | **** Ask MCC for 10 nA and take a 5 M triggers run. | ||
**** Ask MCC for 20 nA and take a 5 M triggers run. | **** Ask MCC for 20 nA and take a 5 M triggers run. | ||
Line 87: | Line 89: | ||
**** Ask MCC for 130 nA and take a 5 M triggers run. | **** Ask MCC for 130 nA and take a 5 M triggers run. | ||
**** Ask MCC for 150 nA and take a 5 M triggers run. | **** Ask MCC for 150 nA and take a 5 M triggers run. | ||
− | *** Once done, ask for 130 nA and take 100 M electron triggers runs of | + | *** Once done, ask for 130 nA and take 100 M electron triggers runs of '''CuSn''' until the end of the shift with the same electron trigger without DC roads: |
− | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | + | **** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change configurations while keeping the same trigger file</font>. |
+ | ***** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
<!--font color=blue><center>---''If everything goes well, the Owl shift should start somewhere in between the listed Cu+Sn luminosity scan runs!'' ---</font></center--> | <!--font color=blue><center>---''If everything goes well, the Owl shift should start somewhere in between the listed Cu+Sn luminosity scan runs!'' ---</font></center--> | ||
* '''Sept. 24th''': | * '''Sept. 24th''': | ||
− | + | ** Continue '''CuSn''' data-taking with 130 nA and 100 M triggers runs until the end of the Owl shift. | |
− | ** Continue | + | ** Continue '''CuSn''' data-taking with 130 nA and 100 M triggers runs until the end of the day shift. |
− | ** Continue | + | ** By the beginning of the swing shift, change the target configuration to CxC, then ask MCC for 30 nA and take at least 6h of 100 M runs. |
− | ** By the beginning of the swing shift, change the target configuration to | ||
** ''Plans may change'' but assuming the MCC MD will be on Monday, Sept. 25th (?), we should check with Denny/target group when they can come in to move the target back to LD2 position. The target won't be filled for the alignment run. <font color=red>Eugene may need to be contacted to ramp down the torus and solenoid magnets. </font> | ** ''Plans may change'' but assuming the MCC MD will be on Monday, Sept. 25th (?), we should check with Denny/target group when they can come in to move the target back to LD2 position. The target won't be filled for the alignment run. <font color=red>Eugene may need to be contacted to ramp down the torus and solenoid magnets. </font> | ||
** Ask for 1 nA, and take 10 M electron triggers run with zero-field and the following electron trigger file based on CTOFxCND coincidence with no-DC-roads: | ** Ask for 1 nA, and take 10 M electron triggers run with zero-field and the following electron trigger file based on CTOFxCND coincidence with no-DC-roads: | ||
Line 101: | Line 103: | ||
* '''Monday, Sept. 25th''': | * '''Monday, Sept. 25th''': | ||
** MCC maintenance/beam studies during the day shift (''TBC'')! | ** MCC maintenance/beam studies during the day shift (''TBC'')! | ||
− | + | ** After establishing the beam in the swing shift on the outbending configuration, take first a Moller run. | |
− | + | ** Take another 50 M triggers run with LD2 for the ECAL calibration upon Cole's request: | |
+ | *** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change configurations while keeping the same trigger file</font>. | ||
**** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
+ | ** Once done, we will switch to production mode with outbending configuration: | ||
+ | *** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change configurations and trigger files </font>. | ||
+ | **** ''Trigger file'': '''TBD'''. | ||
+ | *** '''To-be-continued'''.... | ||
==End-of-run Plan (''Please don't remove!'') == | ==End-of-run Plan (''Please don't remove!'') == |
Revision as of 19:34, 14 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 22nd to Sept. 25th, 2023
End-of-run Plan (Please don't remove!)
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|