<!--font color=red>''Please, Valery, advise whether you want to take this run now with no-DC-roads, assuming all other subsystems will be at their nominal settings!''</font--> | <!--font color=red>''Please, Valery, advise whether you want to take this run now with no-DC-roads, assuming all other subsystems will be at their nominal settings!''</font--> | ||
*** Once done, the RICH setting can be reverted to ''the nominal setting''. Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the shift but change the DAQ configuration to: | *** Once done, the RICH setting can be reverted to ''the nominal setting''. Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the shift but change the DAQ configuration to: | ||
− | **** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font> | + | **** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
***** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ***** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
** '''Target Changeover''': | ** '''Target Changeover''': | ||
Line 106: | Line 106: | ||
** After establishing the beam in the swing shift on the outbending configuration, take first a Moller run. | ** After establishing the beam in the swing shift on the outbending configuration, take first a Moller run. | ||
** Take another 50 M triggers run with LD2 for the ECAL calibration upon Cole's request: | ** Take another 50 M triggers run with LD2 for the ECAL calibration upon Cole's request: | ||
− | *** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font> | + | *** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
**** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | **** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
** Once done, we will switch to production mode with outbending configuration: | ** Once done, we will switch to production mode with outbending configuration: | ||
− | *** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files </font> | + | *** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> |
**** ''Trigger file'': '''TBD'''. | **** ''Trigger file'': '''TBD'''. | ||
*** ''To-be-continued''.... | *** ''To-be-continued''.... |
Revision as of 21:57, 14 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 22nd to Sept. 25th, 2023
End-of-run Plan (Please don't remove!)
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|