Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 42: | Line 42: | ||
*** The trigger experts, Valery and Rafo, need to be notified before starting this run. Take a one-hour-BEAM-ON LD2 run with ''no-DC-roads'' e- trigger @ 35 nA to validate the trigger roads. | *** The trigger experts, Valery and Rafo, need to be notified before starting this run. Take a one-hour-BEAM-ON LD2 run with ''no-DC-roads'' e- trigger @ 35 nA to validate the trigger roads. | ||
**** ''DAQ Config.'': <tt>PROD66_PIN</tt> | **** ''DAQ Config.'': <tt>PROD66_PIN</tt> | ||
− | ***** ''Trigger file'': '''rgd_v1. | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. |
− | |||
− | |||
**'''DC HV Scan, TOF Gain and ECAL Calibrations''': | **'''DC HV Scan, TOF Gain and ECAL Calibrations''': | ||
*** ''All runs will be taken with the e- trigger with no-DC-roads until the trigger roads are validated by the trigger team.''. | *** ''All runs will be taken with the e- trigger with no-DC-roads until the trigger roads are validated by the trigger team.''. | ||
**** ''DAQ Config.'': <tt>PROD66_PIN</tt> | **** ''DAQ Config.'': <tt>PROD66_PIN</tt> | ||
− | ***** ''Trigger file'': '''rgd_v1. | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. |
− | *** Ask MCC for | + | *** Ask MCC for 35 nA beam current and take (''approximately 5 hours'') LD2 runs with 4 DC HV settings. A total of 120 M electron triggers is needed for this study: two HV settings with 50 M each and the other two with 10 M each. More information can be found at [https://wiki.jlab.org/clas12-run/images/2/2a/DCplansRGD.pdf]. '''Florian needs to be called to change the DC HV and confirm the statistics needed'''. |
*** '''P.S.: During the DC HV scan runs, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to perform their CVT bias scans'''. | *** '''P.S.: During the DC HV scan runs, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to perform their CVT bias scans'''. | ||
*** Parasitically, 50 M electron triggers are needed for the TOF gain calibration. | *** Parasitically, 50 M electron triggers are needed for the TOF gain calibration. | ||
*** Parasitically, the same data can be used to conduct a linearity study for the new ECAL PMTs. | *** Parasitically, the same data can be used to conduct a linearity study for the new ECAL PMTs. | ||
− | *** Take a 1.5-hour run with just EPICS, no DAQ. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table] '''Florian needs to be notified to be present in the CR during this run''' (''This could be done whenever it's convenient for Florian, even in-between LD2 Lumi. scans'').<font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> | + | *** Take a 1.5-hour run with just EPICS, no DAQ. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table] '''Florian needs to be notified to be present in the CR during this run''' (''This could be done whenever it's convenient for Florian, even in-between LD2 Lumi. scans''). |
+ | *** Parasitically to the EPICS run, perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA. The process should take 5 to 7 min at max. <font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> | ||
* '''Saturday, Sept. 30th''': | * '''Saturday, Sept. 30th''': | ||
** '''LD2 Luminosity Scan''': | ** '''LD2 Luminosity Scan''': | ||
− | *** This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents and the same | + | *** This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents and the specified trigger files but with the same DAQ configuration: |
**** ''DAQ Config.'': <tt>PROD66_PIN</tt> | **** ''DAQ Config.'': <tt>PROD66_PIN</tt> | ||
− | ***** ''Trigger file'': '''rgd_v1. | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC_5nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. |
**** '''P.S.: Before starting each luminosity scan run, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | **** '''P.S.: Before starting each luminosity scan run, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | ||
**** Ask MCC for 5 nA and take a 5 M triggers run. | **** Ask MCC for 5 nA and take a 5 M triggers run. | ||
− | **** Ask MCC for 20 nA and take a 5 M triggers run. | + | **** Ask MCC for 20 nA and take a 5 M triggers run with the following trigger file: |
− | **** Ask MCC for 35 nA and take a 15 M triggers run. | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC_20nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. |
− | **** Ask MCC for 50 nA and take a 15 M triggers run.<font color=blue><center>-------- ''If everything goes well, that should bring us to the Day shift''-------</font></center> | + | **** Ask MCC for 35 nA and take a 15 M triggers run with the following trigger file: |
+ | ***** ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
+ | **** Ask MCC for 50 nA and take a 15 M triggers run with the following trigger file: | ||
+ | ***** ''Trigger file'': '''rgd_v1.0_no_DC_50nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=blue><center>-------- ''If everything goes well, that should bring us to the Day shift''-------</font></center> | ||
*** Two high-current runs for AI training purposes: | *** Two high-current runs for AI training purposes: | ||
− | **** Ask MCC for 75 nA and take a 50 M triggers run. | + | **** Ask MCC for 75 nA and take a 50 M triggers run with the following trigger file: |
− | **** Ask MCC for 100 nA and take a 50 M triggers run. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease! </font> | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC_90nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. |
− | *** Once done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Day shift, but change the DAQ configuration to: | + | **** Ask MCC for 100 nA and take a 50 M triggers run with the following trigger file: |
+ | ***** ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease! </font> | ||
+ | *** Once done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Day shift, but start performing the RICH Threshold scan as follows, assuming all other detectors are at their nominal settings, ''please check with the RC/AC'': | ||
+ | **** Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_50.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run; | ||
+ | **** Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_100.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run; | ||
+ | **** Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_150.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run;<font color=blue><center>-----''If everything goes well, the Swing shift should start somewhere in-between the RICH scan runs!'' -----</font></center> | ||
+ | *** Whenever the RICH scan is done, continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the Swing shift but change the DAQ/trigger configuration to: | ||
**** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | **** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | ***** ''Trigger file'': '''rgd_v1. | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift'' -----</font></center> |
− | |||
− | |||
* '''Sunday, Oct. 1st''': | * '''Sunday, Oct. 1st''': | ||
− | ** Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the Owl shift with the <tt>PROD66</tt> DAQ configuration and '''rgd_v1. | + | ** Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the Owl shift with the <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC_35nA.trg''' trigger file. |
** '''Target Changeover''': | ** '''Target Changeover''': | ||
− | *** Denny/Xiaodong needs to be called ahead of time to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift'' ---</font></center> | + | *** Denny/Xiaodong needs to be called ahead of time (''at least 30 min in advance'') to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift'' ---</font></center> |
*** Once the access is done, put the flag assembly in the '''CxC''' target configuration, then ask MCC for 30 nA and take a 1/2h-BEAM-ON run as follows: | *** Once the access is done, put the flag assembly in the '''CxC''' target configuration, then ask MCC for 30 nA and take a 1/2h-BEAM-ON run as follows: | ||
**** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | **** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | ***** ''Trigger file'': '''rgd_v1. | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC_30nA.trg'''. |
** '''Solid-target, CxC Configuration, Luminosity Scan''': | ** '''Solid-target, CxC Configuration, Luminosity Scan''': | ||
*** '''P.S.: Before starting each luminosity scan run, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | *** '''P.S.: Before starting each luminosity scan run, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | ||
− | *** Ask MCC for 10 nA and take a 5 M triggers run. | + | *** Ask MCC for 10 nA and take a 5 M triggers run with the following trigger file: |
− | *** We will scan three beam currents in this 5 M triggers run. Ask MCC for 20 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 35 nA for another 1.5 or 2 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 45 nA for the last 1.5 M events while ''monitoring the DC occupancy in mon12''. | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC_10nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. |
− | *** Next, we will scan much higher beam currents in the last 5 M triggers run with this target. Ask MCC for 50 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 75 nA for another 1.5 or 2 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 90 nA for another 1.5 M events while ''monitoring the DC occupancy in mon12''.. <font color=brown>Depending on the detector's performance (HV trips?) during this run, the beam current can be reduced until the level at which the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan should stop or whether this last scan should be taken at a specific current value. </font> | + | *** We will scan three beam currents in this 5 M triggers run. Ask MCC for 20 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 35 nA for another 1.5 or 2 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 45 nA for the last 1.5 M events while ''monitoring the DC occupancy in mon12'', but with the following trigger file: |
+ | ***** ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
+ | *** Next, we will scan much higher beam currents in the last 5 M triggers run with this target. Ask MCC for 50 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 75 nA for another 1.5 or 2 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 90 nA for another 1.5 M events while ''monitoring the DC occupancy in mon12'', but with the following trigger file: | ||
+ | ***** ''Trigger file'': '''rgd_v1.0_no_DC_50nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?) during this run, the beam current can be reduced until the level at which the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan should stop or whether this last scan should be taken at a specific current value. </font> | ||
** Once done, ask for 30 nA (''check with RC/AC after Lumi. scan is done'') and take 100 M electron triggers runs with '''CxC''' target until the end of the Day shift, but change the DAQ configuration as follows: | ** Once done, ask for 30 nA (''check with RC/AC after Lumi. scan is done'') and take 100 M electron triggers runs with '''CxC''' target until the end of the Day shift, but change the DAQ configuration as follows: | ||
*** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | *** ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ||
− | **** ''Trigger file'': '''rgd_v1. | + | **** ''Trigger file'': '''rgd_v1.0_no_DC_30nA.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''-----</font></center> |
− | ** Continue '''CxC''' data-taking with | + | ** Continue '''CxC''' data-taking with 30 nA (''TBD after Lumi. scan'') and 100 M triggers runs until the end of the Swing shift with the same <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC_30nA.trg''' trigger file.<font color=blue><center>---''If everything goes well, that should bring us to the Owl shift''---</font></center> |
* '''Monday, Oct. 2nd''': | * '''Monday, Oct. 2nd''': | ||
− | ** Continue '''CxC''' data-taking with | + | ** Continue '''CxC''' data-taking with 30 nA (''TBD after Lumi. scan'') and 100 M triggers runs until the end of the Owl shift with the same <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC.trg''' trigger file.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> |
** '''Solid-target, CuSn Configuration, Luminosity Scan''': | ** '''Solid-target, CuSn Configuration, Luminosity Scan''': | ||
*** '''P.S.: Before starting each luminosity scan run, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to check the HV setting of MVT'''. | *** '''P.S.: Before starting each luminosity scan run, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to check the HV setting of MVT'''. |
Revision as of 17:33, 28 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 on CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 29th to Oct. 2nd, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|