Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 49: | Line 49: | ||
::‡ '''Parasitically (''Currently Ongoing by Florian'')''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. <font color=blue><center>-----''If everything goes well, the Swing shift should start somewhere in-between the LD2 Lumi. scans!'' -----</font></center> | ::‡ '''Parasitically (''Currently Ongoing by Florian'')''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. <font color=blue><center>-----''If everything goes well, the Swing shift should start somewhere in-between the LD2 Lumi. scans!'' -----</font></center> | ||
* '''Friday, Oct. 6th, Swing Shift''': | * '''Friday, Oct. 6th, Swing Shift''': | ||
− | |||
''' P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel'''! | ''' P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel'''! | ||
− | + | :• Once the Lumi. scan is done, continue LD2 data-taking with 35 nA and 100 M triggers runs until they are ready for controlled access, but change the DAQ/trigger configuration to: | |
:::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | :::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | :::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the controlled access to change the target to solid-foils. |
:• '''Solid-target, CxC Configuration, Luminosity Scan''': | :• '''Solid-target, CxC Configuration, Luminosity Scan''': | ||
::◊ '''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | ::◊ '''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. |
Revision as of 13:08, 6 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 6th to Oct. 8th, 2023
P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|