Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 29: | Line 29: | ||
== '''Run Plan for''' '''Oct. 6th to Oct. 8th''', 2023 == | == '''Run Plan for''' '''Oct. 6th to Oct. 8th''', 2023 == | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
* '''Friday, Oct. 6th, Swing Shift''': | * '''Friday, Oct. 6th, Swing Shift''': | ||
− | ''' P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least | + | :• '''LD2 Luminosity Scan (cont'd)''': |
+ | :◊ Continue the LD2 lumi. scan for the second 50 M high-beam current of 100 nA taken with the ''beam blocker'' IN and the same DAQ configuration: | ||
+ | ::- ''DAQ Config.'': <tt>PROD66_PIN</tt>, but the specified trigger file: | ||
+ | :::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease!</font>. Once done, remove the ''beam blocker'' from the front of the Faraday cup. | ||
+ | ::◊ Once done with the Lumi. scan, remove the beam blocker, and ask MCC for 35 nA for another trigger validation run with the same DAQ configuration but the following trigger file: | ||
+ | :::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
+ | ''' P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least one hour) to inform them about performing access to change the target position to the solid-target position as well as emptying the target in parallel'''! | ||
:• Once the Lumi. scan is done, continue LD2 data-taking with 35 nA and 100 M triggers runs until they are ready for controlled access, but change the DAQ/trigger configuration to: | :• Once the Lumi. scan is done, continue LD2 data-taking with 35 nA and 100 M triggers runs until they are ready for controlled access, but change the DAQ/trigger configuration to: | ||
− | + | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | |
− | :::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the controlled access to change the target to solid-foils. | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the controlled access to change the target to solid-target foils. |
:• '''Solid-target, CxC Configuration, Luminosity Scan''': | :• '''Solid-target, CxC Configuration, Luminosity Scan''': | ||
::◊ '''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | ::◊ '''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. |
Revision as of 15:34, 6 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 6th to Oct. 8th, 2023
P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least one hour) to inform them about performing access to change the target position to the solid-target position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|