Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 36: | Line 36: | ||
::◊ Once done with the Lumi. scan, remove the beam blocker, and ask MCC for 35 nA for another trigger validation run with the same DAQ configuration but the following trigger file: | ::◊ Once done with the Lumi. scan, remove the beam blocker, and ask MCC for 35 nA for another trigger validation run with the same DAQ configuration but the following trigger file: | ||
:::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | :::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
− | ''' P.S.: Both Engineering-on-call and | + | ''' P.S.: Both Engineering-on-call and Xiangdong Wei must be notified ahead of time (at least one hour) to inform them about performing access to change the target position to the solid-target position as well as emptying the target in parallel'''! |
:• Once the Lumi. scan is done, continue LD2 data-taking with 45 nA and 100 M triggers runs until they are ready for controlled access, but change the DAQ/trigger configuration to: | :• Once the Lumi. scan is done, continue LD2 data-taking with 45 nA and 100 M triggers runs until they are ready for controlled access, but change the DAQ/trigger configuration to: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
Line 74: | Line 74: | ||
:• Continue '''CuSn''' data-taking with 125 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Swing shift.<font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''----</font> | :• Continue '''CuSn''' data-taking with 125 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Swing shift.<font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''----</font> | ||
* '''Sunday, Oct. 8th, Day Shift''': | * '''Sunday, Oct. 8th, Day Shift''': | ||
− | :•<font color=Brown> Please call Eugene to change the torus polarity to the outbending configuration. In parallel, | + | :•<font color=Brown> Please call Eugene to change the torus polarity to the outbending configuration. In parallel, Engineering-on-call/Xiangdong Wei should be called so Denny will perform a controlled access to move the target back to the LD2 position while the RC/Xiaodong will fill the LD2 cell. </font> |
:• Once the torus is ramped up to the outbending setting, take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request: | :• Once the torus is ramped up to the outbending setting, take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request: | ||
::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
Revision as of 16:15, 6 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 6th to Oct. 8th, 2023
P.S.: Both Engineering-on-call and Xiangdong Wei must be notified ahead of time (at least one hour) to inform them about performing access to change the target position to the solid-target position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|