Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 31: | Line 31: | ||
* '''Friday, Oct. 6th, Swing Shift''': | * '''Friday, Oct. 6th, Swing Shift''': | ||
:• '''LD2 Luminosity Scan (cont'd)''': | :• '''LD2 Luminosity Scan (cont'd)''': | ||
− | :◊ Continue the LD2 lumi. scan for the second 50 M high-beam current of 100 nA taken with the ''beam blocker'' IN and the | + | :◊ Continue the LD2 lumi. scan for the second 50 M high-beam current of 100 nA taken with the ''beam blocker'' IN and the DAQ configuration without RICH: |
− | ::- ''DAQ Config.'': <tt> | + | ::- ''DAQ Config.'': <tt>PROD66_PIN_noRICH</tt>, but the specified trigger file: |
:::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease!</font>. Once done, remove the ''beam blocker'' from the front of the Faraday cup. | :::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease!</font>. Once done, remove the ''beam blocker'' from the front of the Faraday cup. | ||
::◊ Once done with the Lumi. scan, remove the beam blocker, and ask MCC for 35 nA for another trigger validation run with the same DAQ configuration but the following trigger file: | ::◊ Once done with the Lumi. scan, remove the beam blocker, and ask MCC for 35 nA for another trigger validation run with the same DAQ configuration but the following trigger file: | ||
Line 60: | Line 60: | ||
::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ||
::‡ Change the flag assembly setup to the '''CuSn''' target configuration and perform its luminosity scan with the specified trigger files but with the same DAQ configuration: | ::‡ Change the flag assembly setup to the '''CuSn''' target configuration and perform its luminosity scan with the specified trigger files but with the same DAQ configuration: | ||
− | :::- ''DAQ Config.'': <tt> | + | :::- ''DAQ Config.'': <tt>PROD66_PIN_noRICH</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
::‡ Ask MCC for 90 nA and take a 5 M triggers run with the following trigger file: | ::‡ Ask MCC for 90 nA and take a 5 M triggers run with the following trigger file: | ||
:::- ''Trigger file'': '''rgd_v1.0_no_DC_90nA.trg'''. | :::- ''Trigger file'': '''rgd_v1.0_no_DC_90nA.trg'''. | ||
Line 76: | Line 76: | ||
:•<font color=Brown> Please call Eugene to change the torus polarity to the outbending configuration. In parallel, Engineering-on-call/Xiangdong Wei should be called so Denny will perform a controlled access to move the target back to the LD2 position while the RC/Xiaodong will fill the LD2 cell. </font> | :•<font color=Brown> Please call Eugene to change the torus polarity to the outbending configuration. In parallel, Engineering-on-call/Xiangdong Wei should be called so Denny will perform a controlled access to move the target back to the LD2 position while the RC/Xiaodong will fill the LD2 cell. </font> | ||
:• Once the torus is ramped up to the outbending setting, take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request: | :• Once the torus is ramped up to the outbending setting, take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request: | ||
− | ::- ''DAQ Config.'': <tt> | + | ::- ''DAQ Config.'': <tt>PROD66_PIN_noRICH</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ||
:• Once done, we will switch to production mode with outbending configuration: | :• Once done, we will switch to production mode with outbending configuration: |
Revision as of 16:25, 6 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 6th to Oct. 8th, 2023
P.S.: Both Engineering-on-call and Xiangdong Wei must be notified ahead of time (at least one hour) to inform them about performing access to change the target position to the solid-target position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|