Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 47: | Line 47: | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ||
* '''Sunday, Oct. 8th, Day Shift''': | * '''Sunday, Oct. 8th, Day Shift''': | ||
− | :• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with the CxC target, then | + | :• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with the CxC target, then switch to CuSn. |
:• '''Solid-target, CuSn Configuration, Luminosity Scan (cont'd)''': | :• '''Solid-target, CuSn Configuration, Luminosity Scan (cont'd)''': | ||
::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ||
− | ::‡ Continue the luminosity scan with the specified trigger files | + | ::‡ Continue the luminosity scan with the specified trigger files and the following DAQ configuration: |
:::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | ::‡ Ask MCC to stop the beam, put the beam blocker in then ask for 130 nA and take a 25 M triggers run with the following trigger file: | + | ::‡ Ask MCC to stop the beam, put the beam blocker in, then ask for 130 nA and take a 25 M triggers run with the following trigger file: |
:::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | :::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
::‡ Depending on the stability of detectors in the last CuSn higher beam currents run, we can take a 25 M run @ 150 nA with the same DAQ and trigger configurations. | ::‡ Depending on the stability of detectors in the last CuSn higher beam currents run, we can take a 25 M run @ 150 nA with the same DAQ and trigger configurations. |
Revision as of 16:33, 7 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
Run Plan for Oct. 7th to Oct. 8th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|