Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 50: | Line 50: | ||
:• It depends on the status of the beam: In case the beam is back and a run started, please continue the run until you reach 100 M. Otherwise, once the beam is back, please check the 2H01 and 2C21 beam positions, if reasonable, start a 100 M production run of CuSn target with the following configuration: | :• It depends on the status of the beam: In case the beam is back and a run started, please continue the run until you reach 100 M. Otherwise, once the beam is back, please check the 2H01 and 2C21 beam positions, if reasonable, start a 100 M production run of CuSn target with the following configuration: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ||
− | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <br> If not, do a harp scan by following the procedure described for the case of the beam to FC, compare it to the reference one, and log your results | + | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <br> If not, do a harp scan by following the procedure described for the case of the beam to FC, compare it to the reference one, and log your results. Then, take the 100 M production run mentioned above. |
:• '''Solid-target, CuSn Configuration, Luminosity Scan (cont'd)''': | :• '''Solid-target, CuSn Configuration, Luminosity Scan (cont'd)''': | ||
::‡'''P.S.: Please call ''in advance'' the SVT/MVT experts, Yuri and Rafo, to let them know that we plan to take two high beam currents runs on CuSn that we postponed yesterday due to the instability of beam'''! | ::‡'''P.S.: Please call ''in advance'' the SVT/MVT experts, Yuri and Rafo, to let them know that we plan to take two high beam currents runs on CuSn that we postponed yesterday due to the instability of beam'''! |
Revision as of 06:11, 8 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
Run Plan for Oct. 7th to Oct. 8th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|