Line 38: | Line 38: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Run Plan''' for Wed, Oct. 18 - Sat., Oct. | + | == '''Run Plan''' for Wed, Oct. 18 - Sat., Oct. 23, 2023 == |
− | * Continue production on CxC target as follows: | + | * Continue production on CxC target until roughly 10 AM on Oct. 21st as follows: |
:- Beam current: '''50 nA''' | :- Beam current: '''50 nA''' | ||
:- Run duration: '''100 M events''' | :- Run duration: '''100 M events''' | ||
:- DAQ configuration: <tt>'''PROD67'''</tt> | :- DAQ configuration: <tt>'''PROD67'''</tt> | ||
:- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg''' | :- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg''' | ||
+ | * '''Please call the engineering-on-call to change the target position downstairs to the liquid target position around 10 AM''', depending on the progress of the run as he needs roughly 20 min to be onsite. Please keep the run ongoing until the engineering arrives even if it exceeds 100 M. | ||
+ | * '''In parallel with a rapid access, change the solid flag assembly to "Empty" from the drop menu in the cryo-target GUI and start filling the LD2 cell. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. | ||
+ | * Once the access is done and the cell is filled, ask for beam and continue LD2 production as follows: | ||
+ | :- Beam current: '''50 nA''' | ||
+ | :- Run duration: '''100 M events''' | ||
+ | :- DAQ configuration: <tt>'''PROD67'''</tt> | ||
+ | :- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg'''. | ||
+ | |||
<!-- | <!-- | ||
** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>--> | ** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>--> |
Revision as of 15:29, 20 October 2023
Run Coordinator: Utsav Shrestha (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day or night.
Current Issues
- BMT/FMT/SVT:
- ◊ If new hot channels appear, please call the MVT/SVT/MM expert Yuri Gotra (757-541-7539) to address them.
- Tagger magnet procedure If the tagger magnet needs to be turned off, tell the operator to use only the script for degaussing, NEVER do "by hand"!
- Change the LD2 and solid targets positions in the hall: In case of questions from MCC about the necessary controlled access, please refer to the logbook entry #: 4196113 for the access requirements.
Run Plan for Wed, Oct. 18 - Sat., Oct. 23, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions
Every Shift:
Every Run:
To access the Hall:
|