Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 45: | Line 45: | ||
:- DAQ configuration: <tt>'''PROD67'''</tt> | :- DAQ configuration: <tt>'''PROD67'''</tt> | ||
:- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg''' | :- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg''' | ||
− | * '''Please call the engineering | + | * '''Please call the engineering on-call to change the target position in the hall to the liquid target position around 10 AM''', depending on the progress of the run, as the engineer needs roughly 20 min to be onsite. Please keep the run ongoing until the engineer arrives, even if it exceeds 100 M. |
* '''In parallel with rapid access, change the solid flag assembly to "Empty" from the drop menu in the cryo-target GUI and start filling the LD2 cell. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. | * '''In parallel with rapid access, change the solid flag assembly to "Empty" from the drop menu in the cryo-target GUI and start filling the LD2 cell. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. | ||
* Once the access is done and the cell is filled, ask for the beam and continue LD2 production as follows: | * Once the access is done and the cell is filled, ask for the beam and continue LD2 production as follows: |
Revision as of 19:17, 20 October 2023
Run Coordinator: Utsav Shrestha (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day or night.
Current Issues
- BMT/FMT/SVT:
- ◊ If new hot channels appear, please call the MVT/SVT/MM expert Yuri Gotra (757-541-7539) to address them.
- Tagger magnet procedure If the tagger magnet needs to be turned off, tell the operator to use only the script for degaussing, NEVER do "by hand"!
- Change the LD2 and solid targets positions in the hall: In case of questions from MCC about the necessary controlled access, please refer to the logbook entry #: 4196113 for the access requirements.
- Please ensure the ZOOM session is ALWAYS running in the counting house, as it gets automatically disconnected after being idle with one end user for a while. See its remote connection under the Shift Worker tab.
Run Plan for Fri., Oct. 20 - Sat., Oct. 23, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions
Every Shift:
Every Run:
To access the Hall:
|