− | == '''Run Plan''' == | + | == '''Run Plan, Nov. 7<sup>th</sup> - Sat., Nov. 11<sup>th</sup>, 2023''' == |
+ | * Continue production on CuSn target as follows: | ||
+ | :- Target: '''CuSn''' | ||
+ | :- Beam Blocker: '''IN''' | ||
+ | :- Beam current: '''95 nA +/- 3nA on 2C21A''' | ||
+ | :- Run duration: '''100 M events''' | ||
+ | :- DAQ configuration: <tt>'''PROD67'''</tt> | ||
+ | :- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg''' | ||
− | ''' | + | <span style="font-size:100%; line-height: 2em;"><p class="animate flash"><font color=Blue>'''P.S.: If the beam is widely fluctuating above 95 nA, please ask MCC to narrow down the fluctuation margin and give us the required 95 nA +/- 3nA based on 2C21A reading. They could put the beam current lock on 2C21A in case that may help with the wide fluctuation as it's currently done. We will keep the beam blocker IN while using this target combination!'''</font></p></span> |
− | |||
− | |||
− | |||
− | |||
− | + | *'''Wednesday, Nov 8<sup>th</sup>, 2023: | |
− | + | :• Maintenance Day (Day shift) + Beam Studies (last portion of Owl shift)''': | |
− | + | ::◊ The beam will be taken away around 5 AM for beam studies. | |
− | + | ::◊ Hall B should be switched to controlled access; | |
+ | :::- No survey is needed; we will wait until the beacon stops flashing to perform any controlled access. | ||
+ | ::◊ The beamline expert, Eugene, will contact the counting house around 7 AM to bypass the solenoid interlocks for the planned MVT work. | ||
+ | ::◊ Access requests (so far): | ||
+ | :::- Around 10:30 AM: Maxime, Rafo, Yuri, et al.; | ||
+ | :::- Cole Smith for Ecal/Pcal work; | ||
+ | :::- 14:00: Eugene will perform walkthrough training for one(?) collaborator. | ||
− | + | :• Swing Shift; MD Recovery: | |
− | + | ::◊ Beam restoration: Please review the [[General How-to]] link above for instructions on how to: | |
+ | :::- Establish the physics beam to the tagger dump; | ||
+ | :::- Establish the physics beam to the Faraday Cup. | ||
+ | |||
+ | ::◊ If everything is fine, please insert CuSn back in the beamline along the beam blocker. Resume CuSn data-taking as follows: | ||
+ | * Continue production on CuSn target (''until the end of the Swing shift of Nov. 10<sup>th</sup>'') as follows: | ||
:- Target: '''CuSn''' | :- Target: '''CuSn''' | ||
:- Beam Blocker: '''IN''' | :- Beam Blocker: '''IN''' | ||
Line 56: | Line 70: | ||
<span style="font-size:100%; line-height: 2em;"><p class="animate flash"><font color=Blue>'''P.S.: If the beam is widely fluctuating above 95 nA, please ask MCC to narrow down the fluctuation margin and give us the required 95 nA +/- 3nA based on 2C21A reading. They could put the beam current lock on 2C21A in case that may help with the wide fluctuation as it's currently done. We will keep the beam blocker IN while using this target combination!'''</font></p></span> | <span style="font-size:100%; line-height: 2em;"><p class="animate flash"><font color=Blue>'''P.S.: If the beam is widely fluctuating above 95 nA, please ask MCC to narrow down the fluctuation margin and give us the required 95 nA +/- 3nA based on 2C21A reading. They could put the beam current lock on 2C21A in case that may help with the wide fluctuation as it's currently done. We will keep the beam blocker IN while using this target combination!'''</font></p></span> | ||
+ | |||
+ | *'''Saturday, Nov. 11<sup>th</sup>, Owl Shift: | ||
+ | :• Ask MCC to turn the beam OFF to change the dual solid foils to CxC from the drop menu in the cryo-target GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]. Also, retract the Beam Blocker from the beamline. | ||
+ | :• Once done, resume data-taking on the CxC target as follows: | ||
+ | <!--Production on CxC target:--> | ||
+ | :- Beam current: '''50 nA''' | ||
+ | :- Beam Blocker: '''OUT''' | ||
+ | :- Run duration: '''100 M events''' | ||
+ | :- DAQ configuration: <tt>'''PROD67'''</tt> | ||
+ | :- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg''' | ||
+ | |||
+ | *'''Saturday, Nov. 11<sup>th</sup>, Day Shift: | ||
+ | * '''Please call the engineering on-call to change the target position in the hall to the liquid target position around 10 AM''', depending on the progress of the run, as the engineer needs roughly 20 min to be onsite. Please keep the run ongoing until the engineer arrives, even if it exceeds 100 M. | ||
+ | * '''In parallel with rapid (controlled) access (''if the beacon will stop flashing, otherwise, escorted access''), change the solid flag assembly to "Empty" from the drop menu in the cryo-target GUI and start filling the LD2 cell. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]'''. | ||
+ | * Once the access is done and the cell is filled, ask for the beam and continue LD2 production as follows: | ||
+ | :- Beam current: '''60 nA''' | ||
+ | :- Beam Blocker: '''OUT''' | ||
+ | :- Run duration: '''100 M events''' | ||
+ | :- DAQ configuration: <tt>'''PROD67'''</tt> | ||
+ | :- Trigger file: '''rgd_out_v2.1_Q2_1.2.trg''' | ||
+ | |||
<!-- | <!-- | ||
** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>--> | ** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>--> |
Revision as of 20:16, 7 November 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm in the Counting House), grab the shift expert phone, exit the room through its door to the outside. Do not go to the hallway! Call the RC from outside. RC will call MCC to take the beam away from Hall B and also will inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab as you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours;
- ◊ Arrive at least 10 minutes early for shift change;
- ◊ Refresh the run wiki pages; look over them every shift:
- - Follow the expert/worker shift instructions.
- ◊ Do not spend more than 15-20 min trying to fix a problem. With any issue, contact On-Call Experts or RC.
- ◊ Review these important links:
- - Recent Changes and Current Issues
- - General How-to for beam restoration procedures and Moller runs.
Run Plan, Nov. 7th - Sat., Nov. 11th, 2023
P.S.: If the beam is widely fluctuating above 95 nA, please ask MCC to narrow down the fluctuation margin and give us the required 95 nA +/- 3nA based on 2C21A reading. They could put the beam current lock on 2C21A in case that may help with the wide fluctuation as it's currently done. We will keep the beam blocker IN while using this target combination!
P.S.: If the beam is widely fluctuating above 95 nA, please ask MCC to narrow down the fluctuation margin and give us the required 95 nA +/- 3nA based on 2C21A reading. They could put the beam current lock on 2C21A in case that may help with the wide fluctuation as it's currently done. We will keep the beam blocker IN while using this target combination!
DAQ Operation
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |