Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 32: | Line 32: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Run Plan''', ''' | + | == '''Run Plan''', '''Monday, Nov. 13<sup>th</sup> - Friday, Nov. 17<sup>th</sup>, 2023'''== |
− | * Continue | + | * Continue data-taking with CxC target as follows: |
− | :- | + | <!--Production on CxC target:--> |
− | :- Beam current: ''' | + | :- Beam current: '''50 nA''' |
:- Beam Blocker: '''OUT''' | :- Beam Blocker: '''OUT''' | ||
:- Run duration: '''100 M events''' | :- Run duration: '''100 M events''' | ||
Line 42: | Line 42: | ||
:- Trigger file: '''rgd_out_v2.3_Q2_1.2.trg''' | :- Trigger file: '''rgd_out_v2.3_Q2_1.2.trg''' | ||
− | *''' | + | *'''Tuesday, Nov 14<sup>th</sup>, 2023''': |
− | :• ''' | + | :• '''Beam Studies + Maintenance Day during the Day shift''': |
− | :& | + | ::◊ Please submit any request for access to the '''RC'''. |
− | |||
− | :• | + | :• '''Swing Shift: MD+BS Recovery''': |
− | + | ::◊ Beam restoration: Please review the [[General How-to]] link above for instructions on how to: | |
+ | :::- Establish the physics beam to the tagger dump; | ||
+ | :::- Establish the physics beam to the Faraday Cup. | ||
+ | |||
+ | ::◊ If everything is fine, please insert CxC back in the beamline and resume its data-taking as follows: | ||
::- Beam current: '''50 nA''' | ::- Beam current: '''50 nA''' | ||
::- Beam Blocker: '''OUT''' | ::- Beam Blocker: '''OUT''' |
Revision as of 16:22, 13 November 2023
Run Coordinator: Raphael Dupre (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789, x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm in the Counting House), grab the shift expert phone, exit the room through its door to the outside. Do not go to the hallway! Call the RC from outside. RC will call MCC to take the beam away from Hall B and also will inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab as you need some lead time to set up!
- Note to shift takers:
- ◊ Read the ESAD, COO, RSAD documents found at tab 'General' and in the yellow folder in the counting room. Before you start your first shift for the current experiment, you are required to sign on the list in the yellow folder. Thereby, you confirm that you have read and understood the content.
- ◊ Read the logbook, be aware of previous 24 hours;
- ◊ Arrive at least 10 minutes early for shift change;
- ◊ Refresh the run wiki pages; look over them every shift:
- - Follow the expert/worker shift instructions.
- ◊ Do not spend more than 15-20 min trying to fix a problem. With any issue, contact On-Call Experts or RC.
- ◊ Review these important links:
- - Recent Changes and Current Issues
- - General How-to for beam restoration procedures and Moller runs.
Run Plan, Monday, Nov. 13th - Friday, Nov. 17th, 2023
|
General Instructions
|
|
|
Reference Values
FSD Thresholds from RG-D
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-D
- 2H01 [3]; x= -1.4 mm; y= 0.0 mm
- Tagger (2C24A) [4]: x= -2.0 mm; y= +0.6 mm
- 2C21A [5]: x= -0.4 mm; y= +0.6 mm (less important; values form RG-C)