Difference between revisions of "Template:ShortTermSchedule-RGD"

From clas12-run
Jump to navigation Jump to search
Line 49: Line 49:
 
::◊ For the CD access, the HV of all these detectors, CTOF, BMT, SVT, FMT, and CND, should be turned completely OFF.
 
::◊ For the CD access, the HV of all these detectors, CTOF, BMT, SVT, FMT, and CND, should be turned completely OFF.
  
::◊ Access requests (so far): Please keep track of who is accessing the Hall and log this activity in the shift summary.   
+
::◊ Access requests (so far): ''Please keep track of who is accessing the Hall and log this activity in the shift summary''.   
 
:::- '''CD access''': Yuri Gotra, Armen Stepanyan, Richard Kenney, Chris Maxwell, Chris Cuevas, Rafayel Paremuzyan, Mark Taylor.
 
:::- '''CD access''': Yuri Gotra, Armen Stepanyan, Richard Kenney, Chris Maxwell, Chris Cuevas, Rafayel Paremuzyan, Mark Taylor.
 
:::- More (''TBD'');
 
:::- More (''TBD'');
  
 
::◊ RICH Pedestal run request by M. Mirazita et al.  
 
::◊ RICH Pedestal run request by M. Mirazita et al.  
 +
::◊ RadCon will be notified in tomorrow's 7:45 AM meeting about the items that are left on the survey table in the Hall and need to be surveyed.
  
 
:• '''Swing Shift: SLM Recovery''':  
 
:• '''Swing Shift: SLM Recovery''':  

Revision as of 18:29, 28 November 2023

Run Coordinator: Mikhail Yurov (757) 575-7540

PDL: Nathan Baltzell (9-) 757 876-1789; Office: x5902

RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259

Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.

Important Notes

Do NOT change FSD settings without approval from RC or beamline expert!

  • In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
  • In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
  • If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
  • Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
  • Note to Shift Takers:
◊ Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-D Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
◊ Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
◊ Arrive at least 10 minutes early for shift change;
◊ Refresh the runwiki page/tabs; look over it/them every shift:
- Follow the Shift Expert/Worker tab's instructions.
Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
Review these important links:
- Recent Changes and Current Issues
- General How-to for beam restoration procedures and Møller runs.

Run Plan, Monday, Nov. 20th - Monday, Dec. 4th, 2023

  • Continue CuSn data-taking as follows:
- Target: CuSn
- Beam Blocker: IN
- Beam current: 95 nA +/- 4 nA on 2C21A
- Run duration: 100 M events
- DAQ configuration: PROD67
- Trigger file: rgd_out_v2.3_Q2_1.2.trg
  • Wednesday, Nov. 29th, 2023:
SL Maintenance (Day shift):
◊ The beam will be taken away around 7 AM.
◊ Hall B should be switched to controlled access;
- No survey is needed; we will wait until the beacon stops flashing to perform any controlled access.
◊ The beamline expert, Eugene, will ramp down the solenoid to 1/2-field at his earliest convenience!
◊ For the CD access, the HV of all these detectors, CTOF, BMT, SVT, FMT, and CND, should be turned completely OFF.
◊ Access requests (so far): Please keep track of who is accessing the Hall and log this activity in the shift summary.
- CD access: Yuri Gotra, Armen Stepanyan, Richard Kenney, Chris Maxwell, Chris Cuevas, Rafayel Paremuzyan, Mark Taylor.
- More (TBD);
◊ RICH Pedestal run request by M. Mirazita et al.
◊ RadCon will be notified in tomorrow's 7:45 AM meeting about the items that are left on the survey table in the Hall and need to be surveyed.
Swing Shift: SLM Recovery:
◊ Beam restoration: Please review the General How-to link above for instructions on how to:
- Establish the physics beam to the tagger dump;
- Performing a Møller run with new Wien Angle;
- Establish the physics beam to the Faraday Cup.
◊ If everything goes well with the beam restoration steps and Moller run, please insert CuSn back in the beamline and resume its data-taking as follows:
- Target: CuSn
- Beam Blocker: IN
- Beam current: 95 nA +/- 4 nA on 2C21A
- Run duration: 100 M events
- DAQ configuration: PROD67
- Trigger file: rgd_out_v2.3_Q2_1.2.trg

P.S.: If the beam is widely fluctuating above 95 nA, constantly overshooting over 100 nA on 2C21A, please ask MCC to narrow down the fluctuation margin to keep it below 100 nA based on 2C21A reading. They could put the beam current monitor lock on 2C21A in case that may help with the wide fluctuation and/or adjust our laser phase as well as narrow down the slit width, see ELOG entries 4224300 and 4225220.


General Instructions

  • The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors (especially ECAL sec 2 and 3). If these lights are switched on during an access, they should be switched off when leaving the Hall.
• Refer to these photos: ON: [1], OFF: [2]
• We have a new dome light switch outside of the hall in the labyrinth. The lights can be turned off without entering the Hall. See logbook entry: https://logbooks.jlab.org/entry/4204460
• Note that when the dome lights are switched off, they cannot be turned back on immediately because they require 10-15 min to cool down.
  • Beamline:
• Ignore the Faraday Cup beam current (see Current Issues).
• Do not run over 30 minutes above 90 nA with a 5-pass beam without the beam blocker IN . The beam blocker must be IN for long-running at high currents for 5-pass operations.
• If there is any concern about beam stability, ask MCC if orbit locks are on (they should be).
• Document any beam condition change and send scaler GUIs to HBLOG.
• If HWP is changed, start a new run:
◊ Please check with the beamline expert whether the SLM and FCup charge asymmetry (Q-Asym (%)) readings are set properly, as they will be out of range in case Eugene's script is not run by the experts after the HWP change. The absolute values should be less than 0.1%.
  • For beam tuning and Møller runs
• Make sure the SVT/MVT are set as follows: SVT: LV ON; HV OFF, and MVT: LV ON; HV ON in SAFE Mode.
- When turning MVT OFF, do not press "BMT HV OFF" from HV->Overview->Actions, but instead select BMT HV ON - Safe Voltage. The same applies to FMT select FMT HV ON - Safe Voltage.
- When turning MVT ON: go to HV->Overview->Actions, and select BMT (/FMT) "HV ON - Full Voltage".
- DO NOT start runs in SAFE Mode for Production/Calibration/Various-Studies.
• Turn DC HV off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data.
  • To access the Hall:
• If you need to enter Hall B, alert Denny Insley (757-897-9060, cell/text: 757-810-9576) and the Run Coordinator (757-575-7540).
• Check in with the shift personnel before entering the hall.

DAQ Operation & related General Instructions

  • (New) STANDARD end and start of the run:
- "End run"
- "Abort"
- "Download"
- "Prestart"
- "Go"
  • If any ROC crashes, find out which one (look at the ROC Busies GUI or ROCS tabs in the DAQ runcontrol), and end the ongoing run, which might fail to end properly, and that is OK. You SHOULD issue a roc_reboot command ON JUST THAT ROC before RESTARTING the DAQ. Test with ping ONLY instead of ssh to check whether the ROC is backed up (some may take longer than others). Then, RESTART the DAQ from Scratch.
  • RESTART DAQ from Scratch when changing configuration or trigger files, or when the run did not end correctly, or when ROC(s) is(are) rebooted, or when RICH is FAST/Fully recovered, as follows:
- "Cancel", "Reset"
- "Configure"
- "Download"
- "Prestart"
- "Go"
  • Configuration is PROD66/67 (or PROD66_PIN for fast reconstruction of some calibration/reference runs from the cache disk).
As of 11/25/23, whenever there is an issue with the RICH alarms that can't be resolved within 10 to 15 minutes, please contact the RC (/AC) and the RICH experts to discuss the issue. Meanwhile, we may switch the DAQ configuration to PROD67_noRICH until further notice; see the logbook entry #: 4226898.
  • In case of DAQ Disk space alarm, call the DAQ expert.
  • Trigger files:
- Inbending production: rgd_inb_v1.0.trg
- Outbending production: rgd_out_v2.1_Q2_1.2.trg or rgd_out_v2.3_Q2_1.2.trg with low-Q2 suppression
  • During "Configure", observe the ROC terminals to see whether any ROC has error messages.
  • Some ROCs keep printing error messages while functioning properly; please see their list in this logbook entry # 4215299 to avoid unnecessary reboot since the printout in the ROC terminal won't change. If they get disconnected, the message will appear in the run control itself!
  • In case of DAQ livetime "0" alarm, RESTART DAQ from Scratch;
• Note that you also get a DAQ livetime alarm at the start of a run; that is OK and can be simply acknowledged.
  • Unless a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run for a RICH recovery. Instead, do this in between runs.
  • The shifter MUST check and reset monitoring histograms at least once every 30-60 minutes to ensure no significant detector problems. Sometimes, this is the only way to know that a specific ROC needs to be rebooted.
  • Pop-up window: Enter the beam current and the type of run (e.g., Production and HWP state, IN or OUT) in the "Comment" field.
  • After each step of a DAQ RESTART, ensure it is completed in the Run Control message window. Also, during "Configure", look for error messages in the ROC terminals.
• Contact the DAQ expert if you have any questions or doubts about how to proceed.
  • At the start and end of every run, check that the data filled in the Run Condition Data Base (RCDB) is correct, especially the manually filled fields.

Reference Values

FSD Thresholds from RG-D

  • Upstream: 2 kHz
  • Midstream: 2 kHz
  • Downstream: 100 kHz
  • BOM: 50 kHz
  • 5 ms dwell time

Harp Scan References from RG-D

  • 2H01 [3]; x= -1.4 mm; y= 0.0 mm
  • Tagger (2C24A) [4]: x= -2.0 mm; y= +0.6 mm
  • 2C21A [5]: x= -0.4 mm; y= +0.6 mm (less important; values form RG-C)

IA for Q Asymmetry