Line 41: | Line 41: | ||
:::: - 3-5 nA beam (increase beam until R1 DC occupancies < 2%) | :::: - 3-5 nA beam (increase beam until R1 DC occupancies < 2%) | ||
:::: - Use rgk_v1.0_zero_150MeV.trg, PROD67_PIN configuration | :::: - Use rgk_v1.0_zero_150MeV.trg, PROD67_PIN configuration | ||
− | :::: - Take data for | + | :::: - Take data for 200M total events |
− | |||
*'''Saturday, Jan. 13''': | *'''Saturday, Jan. 13''': | ||
:: OWL | :: OWL | ||
− | :: 00:00 - | + | :: 00:00 - 02:00 |
::: - Continue to take alignment run with cold/empty target | ::: - Continue to take alignment run with cold/empty target | ||
:::: - 3-5 nA beam (increase beam until R1 DC occupancies < 2.5%) | :::: - 3-5 nA beam (increase beam until R1 DC occupancies < 2.5%) | ||
:::: - Use rgk_v1.0_zero_150MeV.trg, PROD67_PIN configuration | :::: - Use rgk_v1.0_zero_150MeV.trg, PROD67_PIN configuration | ||
− | + | :::: - continue until 200M total events, which should be approx. 02:00 | |
− | :::: - continue until | + | :: 02:00 - 04:00 |
− | :: | ||
::: - By this time, we'll have sufficient alignment stats - Prepare for production running | ::: - By this time, we'll have sufficient alignment stats - Prepare for production running | ||
::: - Stop the beam, stop the run. | ::: - Stop the beam, stop the run. | ||
Line 58: | Line 56: | ||
::: - While the magnet is ramping, fill the target (<font color="red">James Brock</font>) | ::: - While the magnet is ramping, fill the target (<font color="red">James Brock</font>) | ||
:::: - Target should take 20-30 minutes to fill. If it is not done by 45 minutes, call James. | :::: - Target should take 20-30 minutes to fill. If it is not done by 45 minutes, call James. | ||
− | :: | + | :: 04:00 - 08:00 - Preliminary production running. |
::: Note: make sure to change BMT HV to full field setting. | ::: Note: make sure to change BMT HV to full field setting. | ||
::: - Take production data runs - rgk_noDC_v1.0_300MeV.trg, PROD67_PIN configuration | ::: - Take production data runs - rgk_noDC_v1.0_300MeV.trg, PROD67_PIN configuration | ||
Line 64: | Line 62: | ||
::: - Start with 75 nA, but adjust as needed to keep R1 DC occupancies < 5% and DAQ livetime ~90% | ::: - Start with 75 nA, but adjust as needed to keep R1 DC occupancies < 5% and DAQ livetime ~90% | ||
:::: - Feel free to call RC for guidance on settings | :::: - Feel free to call RC for guidance on settings | ||
− | ::: - <font color="red"> Look at DC occupancy in Mon12 to check that sectors are relatively uniform. | + | ::: - <font color="red"> Look at DC occupancy in Mon12 to check that sectors are relatively uniform. If a large degree of non-uniformity, call the RC</font> so we can consider a small change in the beam position to see if the uniformity can be improved. If things are relatively uniform, keep the beam where it is. |
::: - Normalize the DAQ trigger alarms once final beam current is chosen | ::: - Normalize the DAQ trigger alarms once final beam current is chosen | ||
− | ::: - Review all mon12 | + | ::: - Review all mon12 plots throughout the run |
::: - Monitor the DAQ rate via strip chart throughout the run and notify the RC if there are any DAQ trigger alarms not due to beam excursions/trips | ::: - Monitor the DAQ rate via strip chart throughout the run and notify the RC if there are any DAQ trigger alarms not due to beam excursions/trips | ||
::: - Post standard beamline overview screen and DAQ screens (CLAS12 Trigger Bits, ROC Rates, ROC Busies, DAQ status) in the logbook | ::: - Post standard beamline overview screen and DAQ screens (CLAS12 Trigger Bits, ROC Rates, ROC Busies, DAQ status) in the logbook |
Revision as of 20:54, 12 January 2024
Experiment Coordinator: Annalisa D'Angelo
Run Coordinator: Axel Schmidt (757) 575-7540
PDL: Daniel Carman (757) 876-1789; Office: x5586
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- Arrive at least 10 minutes early for shift change;
- Refresh the runwiki page/tabs; look over it/them every shift:
- Follow the Shift Expert/Worker tab's instructions.
- Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- Important links
- Recent Changes and Current Issues
- General How-to for beam restoration procedures and Møller runs.
Run Plan, Friday, Jan. 12 - Tuesday, Jan. 16, 2024
|
General Information
|
DAQ Operation & Related General Information
|
|
Reference Values
FSD Thresholds from RG-K
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-K
updated Swing shift Jan 12, 2024
- 2C21A
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238636
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4238636 x= -0.4 mm; y= +0.6 mm
- Tagger (2C24A)
- Jan. 12, 2024 Swing (after attempts to improve beam profile): https://logbooks.jlab.org/entry/4238887
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238638
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4238622 x= -2.0 mm; y= +0.6 mm
- 2H01
- Jan. 12, 2024 Swing (after attempts to improve beam profile): https://logbooks.jlab.org/entry/4238889
- Jan. 12, 2024 Owl: https://logbooks.jlab.org/entry/4238673
- Compare to Dec 2023: https://logbooks.jlab.org/entry/4234764 x= -1.1 mm; y= 0.6 mm
To Do Items
- Faraday Cup Calibration
- Empty target running (with full field)