Difference between revisions of "Template:ShortTermSchedule-RGE"
Jump to navigation
Jump to search
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1605705819), except on Wednesdays, which is @ 15:00 in CH Room 200C and at the same ZOOM link.
Line 9: | Line 9: | ||
* In case of evacuation of the Counting Room (e.g., due to a ''fire alarm''), grab the shift expert phone and leave the room through the "<font color=red>EXIT</font>" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter can call MCC to turn the beam OFF for Hall B and inform other Hall B staff members. | * In case of evacuation of the Counting Room (e.g., due to a ''fire alarm''), grab the shift expert phone and leave the room through the "<font color=red>EXIT</font>" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter can call MCC to turn the beam OFF for Hall B and inform other Hall B staff members. | ||
* If you have symptoms or a positive COVID test, do NOT come to your shift. Instead, inform the PDL, the RC, and JLab medical services immediately to arrange replacements. | * If you have symptoms or a positive COVID test, do NOT come to your shift. Instead, inform the PDL, the RC, and JLab medical services immediately to arrange replacements. | ||
− | * <font color=Blue>In case of a problem with the HV Slow Controls, EPICS in general, please call the primary expert on-call | + | * <font color=Blue>In case of a problem with the HV Slow Controls, EPICS in general, please call the primary expert on-call, Nathan Baltzell, before reaching out to anyone else.</font> |
'''Please put all essential information on the main hall B log HBLOG. Some important alarms have been documented on HBRUN. Use the pulldown menu to choose where an error is reported.''' | '''Please put all essential information on the main hall B log HBLOG. Some important alarms have been documented on HBRUN. Use the pulldown menu to choose where an error is reported.''' | ||
Line 17: | Line 17: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Current Run Plan: May 8<sup>th</sup> to May | + | == '''Current Run Plan: May 8<sup>th</sup> to May 19<sup>th</sup>''' == |
* Take production data! Don't break anything! | * Take production data! Don't break anything! | ||
* Keep an eye on the backgrounds, such as in the halo counters and the 2C24 and 2H01 BPM positions. Both of these give confidence that the beam remains centered on the RGE target. | * Keep an eye on the backgrounds, such as in the halo counters and the 2C24 and 2H01 BPM positions. Both of these give confidence that the beam remains centered on the RGE target. | ||
− | * See the | + | * See the {{#switchtablink:General_Information|General_Information}} tab for specific issues with the detector subsystems. |
− | === '''Production data taking: LD2+Al runs''' === | + | === '''Production data taking until May 14<sup>th</sup>midnight: LD2+Al runs''' === |
:<font color=Brown>• Target: LD2 + Al | :<font color=Brown>• Target: LD2 + Al | ||
:• Beam Blocker: IN | :• Beam Blocker: IN | ||
Line 32: | Line 32: | ||
:• 3-hour runs</font> | :• 3-hour runs</font> | ||
− | * If you need to manipulate the whole target system - | + | * If you need to manipulate the whole target system - cryo-target or solid - please contact the target experts. |
* For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 | * For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 | ||
− | * Long-term run plan can be found in this link: [https://docs.google.com/spreadsheets/d/13CvaWromHWRBfxoPrRsy8AD4omTOl0SQkHT6A3mJbRw/edit#gid=967597323], | + | === '''Lumi Scan for LD2+Al on May 15<sup>th</sup>''' === |
− | :• ''Luminosity scan for LD2+Al'': Take runs at various beam currents spanning the range from 5 nA to 70 nA with a 15 nA step. | + | |
− | : | + | :<font color=Brown>• Beam Blocker: OUT |
− | : | + | :• Take one 5 nA run for 4 hours |
− | : | + | :• Take one 20 nA run for 3 hours |
− | : | + | :• Take one 45 nA run for 1.5 hours |
+ | |||
+ | :• P.S.: ''Still waiting for the verdict from Hall C on whether they will perform their 5<sup>th</sup> pass change tomorrow or Thursday morning, as that will slightly affect the sequence of our planned run plan activities''. </font> | ||
+ | |||
+ | * <font color=BLUE>Long-term run plan can be found in this link: [https://docs.google.com/spreadsheets/d/13CvaWromHWRBfxoPrRsy8AD4omTOl0SQkHT6A3mJbRw/edit#gid=967597323], and is outlined below: | ||
+ | <!--:• ''Luminosity scan for LD2+Al'': Take runs at various beam currents spanning the range from 5 nA to 70 nA with a 15 nA step. --> | ||
+ | :# Conduct Lumi. scan for LD2+Pb at 5 nA (~ 4h), 10 nA (~ 4h), 20 nA (~ 3h), and 40 nA (~ 2h) | ||
+ | :# Perform the '''Streaming Readout Test''' | ||
+ | :# Take one Empty+Al @ 70 nA run for 3 hours | ||
+ | :# Take one Empty+Empty run @ 200 nA for 5 hours | ||
+ | :# Reverse the torus magnet polarity and fill the LD2 target | ||
+ | :# Take outbending data with LD2+C and/or LD2+Pb until the beam is down on May 19<sup>th</sup> at 7 a.m.</font> | ||
== ''Previous Dual-target Configuration Plans'' == | == ''Previous Dual-target Configuration Plans'' == |
Revision as of 22:20, 14 May 2024
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (757) 876-1789, Office: x5902
Important Notes
- In case of medical or fire emergency, call 911 or 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter can call MCC to turn the beam OFF for Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift. Instead, inform the PDL, the RC, and JLab medical services immediately to arrange replacements.
- In case of a problem with the HV Slow Controls, EPICS in general, please call the primary expert on-call, Nathan Baltzell, before reaching out to anyone else.
Please put all essential information on the main hall B log HBLOG. Some important alarms have been documented on HBRUN. Use the pulldown menu to choose where an error is reported.
Current Run Plan: May 8th to May 19th
Production data taking until May 14thmidnight: LD2+Al runs
Lumi Scan for LD2+Al on May 15th
Previous Dual-target Configuration Plans- DC firmware test plan (LD2 + Pb)1) Take one run each with 1M events with the trigger files and beam current at 70 nA
2) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_2.trg 3) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_4.trg
*** Notes ***
LD2+Pb runs
LD2+Sn runs
|
References- BPM Positions
- Harp Scans- FSD Thresholds
- Charge Asymmetry- Upstream Halo counters
|
General Reminders
|
DAQ Operation
|