Difference between revisions of "Template:ShortTermSchedule-RGD"
(59 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | '''Run Coordinator: | + | '''Run Coordinator: Lamiaa El Fassi''' (757) 575-7540 |
''' PDL: Nathan Baltzell''' (9-) 757 876-1789; ''Office'': x5902 | ''' PDL: Nathan Baltzell''' (9-) 757 876-1789; ''Office'': x5902 | ||
Line 31: | Line 31: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Run Plan''', ''' | + | == '''Run Plan''', '''Thursday, Dec. 14<sup>th</sup> - Friday, Dec. 15<sup>th</sup>, 2023'''== |
− | * Continue CuSn data-taking as follows: | + | * Continue CuSn data-taking as follows until 7 AM on Dec. 15<sup>th</sup> when the beam will be taken away for the RG-K setup: |
:- Target: '''CuSn''' | :- Target: '''CuSn''' | ||
:- Beam Blocker: '''IN''' | :- Beam Blocker: '''IN''' | ||
− | :- Beam current: ''' | + | :- Beam current: '''100 nA +/- 4 nA on 2C21A''' |
:- Run duration: '''100 M events''' | :- Run duration: '''100 M events''' | ||
:- DAQ configuration: <tt>'''PROD67'''</tt> | :- DAQ configuration: <tt>'''PROD67'''</tt> | ||
:- Trigger file: '''rgd_out_v2.3_Q2_1.2.trg''' | :- Trigger file: '''rgd_out_v2.3_Q2_1.2.trg''' | ||
− | + | <span style="font-size:100%; line-height: 2em;"><p class="animate flash"><font color=Blue>'''P.S.: If the beam is widely fluctuating above 105 nA, constantly overshooting over 105 nA on 2C21A, please ask MCC to narrow down the fluctuation margin to keep it below 105 nA based on 2C21A reading. They could put the beam current monitor lock on 2C21A in case that may help with the wide fluctuation and/or adjust our laser phase as well as narrow down the slit width, see ELOG entries [https://logbooks.jlab.org/entry/4224300 4224300] and [https://logbooks.jlab.org/entry/4225220 4225220].'''</font></p></span> | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | <span style="font-size:100%; line-height: 2em;"><p class="animate flash"><font color=Blue>'''P.S.: If the beam is widely fluctuating above | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| valign=top | | | valign=top | | ||
Line 115: | Line 83: | ||
:- "Go" | :- "Go" | ||
− | * <font color=red> If any ROC crashes, find out which one (''look at the ROC Busies GUI or ROCS tabs in the DAQ runcontrol''), and end the ongoing run, which ''might fail to end properly, and that is OK''. You SHOULD | + | * <font color=red> If any ROC crashes, find out which one (''look at the ROC Busies GUI or ROCS tabs in the DAQ runcontrol''), and end the ongoing run, which ''might fail to end properly, and that is OK''. You SHOULD do "Cancel" and "Reset" in the DAQ Run Control before issuing a '''roc_reboot''' command ON JUST THAT ROC and continuing with the DAQ Restart chain from "Configure". Test with ''ping'' ONLY instead of ''ssh'' to check whether the ROC is backed up. </font> |
+ | :◊ <font color=brown> When pinging a ROC, e.g., "''ping mvt1''", stop it with ''Ctrl+C'' after a couple of printouts showing different latency times. </font> | ||
− | * ''' | + | * '''Restart DAQ from Scratch''' when changing configuration or trigger files, or when the run did not end correctly, or when ROC(s) is(are) rebooted, or when RICH is Fastly/Fully recovered, as follows: |
:- "Cancel", "Reset" | :- "Cancel", "Reset" | ||
+ | :- "Needed operations: change configuration or trigger files, or a run did not end correctly, or a ROC crash or RICH is Fastly/Fully recovered"; | ||
:- "Configure" | :- "Configure" | ||
:- "Download" | :- "Download" |
Latest revision as of 23:44, 14 December 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-) 757 876-1789; Office: x5902
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- ◊ Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-D Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- ◊ Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- ◊ Arrive at least 10 minutes early for shift change;
- ◊ Refresh the runwiki page/tabs; look over it/them every shift:
- - Follow the Shift Expert/Worker tab's instructions.
- ◊ Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- ◊ Review these important links:
- - Recent Changes and Current Issues
- - General How-to for beam restoration procedures and Møller runs.
Run Plan, Thursday, Dec. 14th - Friday, Dec. 15th, 2023
P.S.: If the beam is widely fluctuating above 105 nA, constantly overshooting over 105 nA on 2C21A, please ask MCC to narrow down the fluctuation margin to keep it below 105 nA based on 2C21A reading. They could put the beam current monitor lock on 2C21A in case that may help with the wide fluctuation and/or adjust our laser phase as well as narrow down the slit width, see ELOG entries 4224300 and 4225220. |
General Instructions
|
|
|
Reference Values
FSD Thresholds from RG-D
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-D
- 2H01 [3]; x= -1.4 mm; y= 0.0 mm
- Tagger (2C24A) [4]: x= -2.0 mm; y= +0.6 mm
- 2C21A [5]: x= -0.4 mm; y= +0.6 mm (less important; values form RG-C)