Difference between revisions of "Template:ShortTermSchedule-RGE"
Jump to navigation
Jump to search
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1605705819), except on Wednesdays, which is @ 15:00 in CH Room 200C and via the same ZOOM link.
(18 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | '''Run Coordinator: Sebouh Paul ''' | + | '''Run Coordinator: Sebouh Paul ''' (757) 575-7540 |
− | '''Current RP Coordinator: Lamiaa El Fassi''' | + | '''Current RP Coordinator: Lamiaa El Fassi''' |
'''PDL: Nathan Baltzell''' (757) 876-1789, Office: x5902 | '''PDL: Nathan Baltzell''' (757) 876-1789, Office: x5902 | ||
Line 19: | Line 19: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Current Run Plan: May | + | == '''Current Run Plan: May 18<sup>th</sup> to May 19<sup>th</sup>''' == |
* Take production data! Don't break anything! | * Take production data! Don't break anything! | ||
Line 30: | Line 30: | ||
* For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 | * For information on triggers, please see here: https://logbooks.jlab.org/entry/4267187 | ||
− | === ''' | + | * Long-term run plan was also highlighted in this [https://docs.google.com/spreadsheets/d/13CvaWromHWRBfxoPrRsy8AD4omTOl0SQkHT6A3mJbRw/edit#gid=967597323 RG-E Calendar link] |
+ | |||
+ | === '''Outbending Configuration Runs''' === | ||
:<font color=Brown>• Beam Blocker: IN | :<font color=Brown>• Beam Blocker: IN | ||
+ | :• Beam Current: 70 nA | ||
+ | :• Target: LD2+Pb | ||
:• Configuration: <tt>PROD67</tt> (w/o. PIN option) | :• Configuration: <tt>PROD67</tt> (w/o. PIN option) | ||
− | :• Trigger: <tt> | + | :• Trigger: <tt>rge_noDC_v1.0_300MeV.trg</tt> |
− | :• | + | :• 3-hour or 100 M events run, whatever comes first!</font> |
− | + | <!--and is outlined below::# Take outbending data with LD2+C, then LD2+Pb until the beam is taken away on May 19<sup>th</sup> at 7 a.m. for the accelerator beam studies.--> | |
− | |||
− | :# Take outbending data with LD2+C | ||
== ''Previous Dual-target Configuration Plans'' == | == ''Previous Dual-target Configuration Plans'' == | ||
− | + | <big>''- DC firmware test plan (LD2+Pb):''</big> | |
1) Take one run each with 1M events with the trigger files and beam current at 70 nA | 1) Take one run each with 1M events with the trigger files and beam current at 70 nA | ||
Line 105: | Line 107: | ||
:• Trigger: <tt>rge_inb_v1.0_200MeV.trg</tt> | :• Trigger: <tt>rge_inb_v1.0_200MeV.trg</tt> | ||
:• Take one Empty+Al run @ 70 nA w/. BB for 5 hours (w/. Beam ON) | :• Take one Empty+Al run @ 70 nA w/. BB for 5 hours (w/. Beam ON) | ||
+ | :• Take one Empty+Wire run @ 200 nA w/. BB for approx. 8 hours (''BB calibration is done by Rafo and Lamiaa/MCC OPS over phone'') | ||
+ | |||
+ | == ''Outbending Configuration Runs'' on May 17<sup>th</sup> - 19<sup>th</sup>'' === | ||
+ | :• Beam Blocker: IN | ||
+ | :• Beam Current: 70 nA | ||
+ | :• Target: LD2+C | ||
+ | :• Configuration: <tt>PROD67</tt> (w/o. PIN option) | ||
+ | :• Trigger: <tt>rge_noDC_v1.0_300MeV.trg</tt>, or | ||
+ | ::♦ Trigger: <tt>rge_noDC_v1.0_200MeV.trg</tt>, and Beam Current: 60 nA or | ||
+ | ::♦ Trigger: <tt>rge_noDC_v1.0_250MeV.trg</tt>, and Beam Current: 65 nA | ||
+ | :• 3-hour or 100 M events run, whatever comes first! | ||
| valign=top | | | valign=top | |
Latest revision as of 18:44, 18 May 2024
Run Coordinator: Sebouh Paul (757) 575-7540
Current RP Coordinator: Lamiaa El Fassi
PDL: Nathan Baltzell (757) 876-1789, Office: x5902
Important Notes
- In case of medical or fire emergency, call 911 or 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter can call MCC to turn the beam OFF for Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift. Instead, inform the PDL, the RC, and JLab medical services immediately to arrange replacements.
- In case of a problem with the HV Slow Controls, EPICS in general, please call the primary expert on-call, Nathan Baltzell, before reaching out to anyone else.
- Please put all essential information on the main Hall B logbook HBLOG. Some important alarms have been documented on HBRUN. Use the pulldown menu to choose where an error is reported.
Current Run Plan: May 18th to May 19th
Outbending Configuration Runs
Previous Dual-target Configuration Plans- DC firmware test plan (LD2+Pb): 1) Take one run each with 1M events with the trigger files and beam current at 70 nA
2) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_2.trg 3) Take one run with 500k events and beam current at 35nA with trigger file rge_inb_v1.0_200MeV_dcrb17_4.trg
*** Notes ***
LD2+Pb runs
LD2+Sn runs
LD2+Al runs
Lumi Scan for LD2+Al on May 15th
Lumi Scan for LD2+Pb on May 15th - 16th
Streaming Readout Test
Empty-target runs on May 16th - 17th
Outbending Configuration Runs on May 17th - 19th =
|
References- BPM Positions
- Harp Scans- FSD Thresholds
- Charge Asymmetry- Upstream Halo counters
|
General Reminders
|
DAQ Operation
|