Difference between revisions of "Run Meeting: July 31st, 2020"

From clas12-run
Jump to navigation Jump to search
 
Line 10: Line 10:
  
 
https://logbooks.jlab.org/entry/3818552
 
https://logbooks.jlab.org/entry/3818552
 
==Plans:==
 
 
Purge and fill target with Hydrogen. then set to empty by end of day before (possible) beam to Faraday cup.  This is to be coordinated with the PD.
 
 
After the magnetic field scan, would like to do an HV scan over a fixed magnetic field for the solenoid. Eugene will ramp up the Solenoid to 800A (1.68 T).  Jiwan will start taking cosmic data using ctof for the trigger at different HV settings for BONuS12 -RTPC.
 

Latest revision as of 12:16, 31 July 2020

Back to Run Group F | Daily Run Group F Coordination Meetings

10:00AM Run Meeting, Bluejeans = 757 683 5804

RC: Narbe Kalantarians

Summary of past 24h:

  • Summary in the RC Daily Report

https://logbooks.jlab.org/entry/3818552