Difference between revisions of "Run Meeting: August 16th, 2020"

From clas12-run
Jump to navigation Jump to search
(Created page with "Back to Run Group F | Daily Run Group F Coordination Meetings 10:00AM Run Meeting, <s>Counting house meeting room (200C)</s> ONLINE '''RC:''' Carlos Ayer...")
 
 
Line 6: Line 6:
  
 
==Summary of past 24h:==
 
==Summary of past 24h:==
 +
 +
DAY: https://logbooks.jlab.org/entry/3827907 <br/>
 +
SWING: https://logbooks.jlab.org/entry/3828115<br/>
 +
OWL: https://logbooks.jlab.org/entry/3828307<br/>
 +
 +
* Finished the target gas dance Day: Empty->Helium->Deuterium (after 6 flushes)
 +
* run 200nA@10.4GeV over Deuterium without major incidents.
 +
* Due to a CHL trip, beam is down since ~08:00. It was expected to be down for 4h (but still waiting at the moment of this meeting).
 +
 +
Actually a very good day.
  
 
==Info==
 
==Info==

Latest revision as of 10:29, 16 August 2020

Back to Run Group F | Daily Run Group F Coordination Meetings

10:00AM Run Meeting, Counting house meeting room (200C) ONLINE

RC: Carlos Ayerbe

Summary of past 24h:

DAY: https://logbooks.jlab.org/entry/3827907
SWING: https://logbooks.jlab.org/entry/3828115
OWL: https://logbooks.jlab.org/entry/3828307

  • Finished the target gas dance Day: Empty->Helium->Deuterium (after 6 flushes)
  • run 200nA@10.4GeV over Deuterium without major incidents.
  • Due to a CHL trip, beam is down since ~08:00. It was expected to be down for 4h (but still waiting at the moment of this meeting).

Actually a very good day.

Info

BlueJeans connection info:

To join the Meeting: https://bluejeans.com/7576835804