Difference between revisions of "Run Meeting: August 21st, 2020"

From clas12-run
Jump to navigation Jump to search
Line 18: Line 18:
  
 
=== Swing shift ===
 
=== Swing shift ===
# Shift summary by the shift expert:  
+
# Shift summary by the shift expert: https://logbooks.jlab.org/entry/3831991
# Issues:  
+
# Issues: a power supply was tripped at the end of the HWP out moller run. Eugene said, this will take time to fix/replace the power supply and we decided to move with sending the beam to FC.
# Recorded data:  
+
# Recorded data: nothing yet ... (21:13 )
  
 
=== Whole day summary ===
 
=== Whole day summary ===

Revision as of 20:13, 21 August 2020

Back to Run Group F | Daily Run Group F Coordination Meetings

12:00PM RC Meeting (https://bluejeans.com/7576835804)

RC: M. Hattawy

Summary of Aug. 21th

Owl shift

  1. Shift summary by the shift expert: shift was cancelled.
  2. Issues: NL vacuum issue.
  3. Recorded data: 0

Day shift

  1. Shift summary by the shift expert: https://logbooks.jlab.org/entry/3831852
  2. Issues: NO beam because of the NL vacuum issue.
  3. Recorded data: zero

Swing shift

  1. Shift summary by the shift expert: https://logbooks.jlab.org/entry/3831991
  2. Issues: a power supply was tripped at the end of the HWP out moller run. Eugene said, this will take time to fix/replace the power supply and we decided to move with sending the beam to FC.
  3. Recorded data: nothing yet ... (21:13 )

Whole day summary

  1. Total recorded data today:
  2. Part-II total accumulated data on D2: 754M + ...
  3. Concerns:


Tomorrow daily RC meeting will be at usual time 12:00 PM using the link https://bluejeans.com/7576835804/

Recorded data numbers

Number of events recorded