Difference between revisions of "RGM RC Meeting Feb2 Feb9"

From clas12-run
Jump to navigation Jump to search
Line 36: Line 36:
 
'''Wednesday, Feb 2, SWING'''
 
'''Wednesday, Feb 2, SWING'''
 
  * continue running on Sn target with 90 nA, beam blocker IN
 
  * continue running on Sn target with 90 nA, beam blocker IN
  * from Run#15819 on, beam blocker calibration from 4 GeV run on Sn(x4) target is uploaded <--
+
  * from Run#15819 on, beam blocker calibration from 6 GeV run on single foil Sn target is uploaded <--
  
  
 
= Statistics =
 
= Statistics =
 
[[File:Screenshot from 2022-02-02 15-12-20.png]]
 
[[File:Screenshot from 2022-02-02 15-12-20.png]]

Revision as of 15:53, 2 February 2022

Tuesday, Feb 1, SWING

* running on LAr until 8pm 
** 6 GeV 25 nA on LAr 70.7M events, runs 15289 - 15802

* empty LAr target 
* 1 hour empty target run, 150nA, beam blocker IN
* beam blocker calibration 
* insert single foil Sn (200 mg/cm2) target
* beam blocker calibration for 6 GeV on single foil Sn target 
** noticed that target cannot be in beam
* beam line expert (Eugene) to the rescue: positions target per expert mode

* from Run #15805 on: beam blocker calibration from 4 GeV run on Sn(x4) target is uploaded <--
* start running on repositioned target Sn with 90 nA, beam blocker IN
** tdcpcal3 histograms empty goes unnoticed

Wednesday, Feb 2, OWL

* continue running on Sn target with 90 nA, beam blocker IN
** some detector/DAQ issues, some beam issues 
** tdcpcal3 histograms empty goes unnoticed
** BST has noisy strips with SN target and in beam 
*** expert: most prominent with tin target and this might be due to electrical conductivity of the foil

Wednesday Feb 2, DAY

* warming up LAr target to room temp while running
* continue running on Sn target with 90 nA, beam blocker IN
** tdcpcal3 issuefixed
** more issues: HV drop pcal and ftof in sector 3, ok after turning HVs back on
* BST noisy strips: access hall to make a test with target motor off, no change
* performed beam blocker calibration with Sn target
* continue running on Sn target with 90 nA, beam blocker IN

Wednesday, Feb 2, SWING

* continue running on Sn target with 90 nA, beam blocker IN
* from Run#15819 on, beam blocker calibration from 6 GeV run on single foil Sn target is uploaded <--


Statistics

Screenshot from 2022-02-02 15-12-20.png