Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 39: | Line 39: | ||
** '''Parasitic studies''': | ** '''Parasitic studies''': | ||
*** When it's convenient, perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC ops using a 5 nA beam current increase steps until reaching 35 nA while starting the random trigger run. The process should take 5 to 7 min at max. | *** When it's convenient, perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC ops using a 5 nA beam current increase steps until reaching 35 nA while starting the random trigger run. The process should take 5 to 7 min at max. | ||
− | *** The SVT/MVT expert could perform any SVT/MVT studies that fit within ongoing activities prior to production. (<font color=red>''Comments and suggestions to be notified or add to this run plan are welcome''</font>) | + | *** The SVT/MVT expert could perform any SVT/MVT studies that fit within ongoing activities prior to production. (<font color=red>''Comments and suggestions to be notified or add to this run plan are welcome''</font>) <font color=blue><center>-------- ''If everything goes well, that should bring us to the Swing shift'' -------</font></center> |
− | <font color=blue>-------- ''If everything goes well, that should bring us to the Swing shift'' -------</font> | + | **'''DC HV Scan, TOF Gain and ECAL Calibrations''': |
− | ** '''DC HV Scan, TOF Gain and ECAL Calibrations''': | ||
***Need to take 5 hours with a total of 120 M electron triggers and different DC HV settings. '''Florian needs to be consulted'''. (<font color=red>''I can't access Florian's table in Nathan's shared RG-D Special Runs document. Please, Florian, advise what needs to be specified here!''</font>) | ***Need to take 5 hours with a total of 120 M electron triggers and different DC HV settings. '''Florian needs to be consulted'''. (<font color=red>''I can't access Florian's table in Nathan's shared RG-D Special Runs document. Please, Florian, advise what needs to be specified here!''</font>) | ||
*** Parasitically, 50 M electron triggers are needed for the TOF gain calibration <font color=red>''Please, Daniel, advise whether you need to be contacted for any specific setup for that!''</font>) | *** Parasitically, 50 M electron triggers are needed for the TOF gain calibration <font color=red>''Please, Daniel, advise whether you need to be contacted for any specific setup for that!''</font>) |
Revision as of 14:21, 8 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 15:30: CH Room 200C, and on Zoom: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
LE: Please don't change: Work in progress
Short-Term Schedule for the Week from Sept 13th to Sept. 20th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C
Harp Scan References from RG-C |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|