Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 35: | Line 35: | ||
*** Call MCC and ask for 35 nA and take 4 hours LD2 target run with a ''random trigger'' to validate electron trigger; | *** Call MCC and ask for 35 nA and take 4 hours LD2 target run with a ''random trigger'' to validate electron trigger; | ||
**** ''Trigger file: TBD''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | **** ''Trigger file: TBD''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
− | *** Take one hour LD2 run with inbending ''no-DC-roads | + | *** Take one hour LD2 run with the inbending e- trigger with ''no-DC-roads'' to validate the trigger roads. |
**** ''Trigger file: TBD''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | **** ''Trigger file: TBD''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
** '''Parasitic studies''': | ** '''Parasitic studies''': | ||
Line 41: | Line 41: | ||
*** The SVT/MVT expert could perform any SVT/MVT studies that fit within ongoing activities prior to production. (<font color=red>''Comments and suggestions to be notified or add to this run plan are welcome''</font>) <font color=blue><center>-------- ''If everything goes well, that should bring us to the Swing shift'' -------</font></center> | *** The SVT/MVT expert could perform any SVT/MVT studies that fit within ongoing activities prior to production. (<font color=red>''Comments and suggestions to be notified or add to this run plan are welcome''</font>) <font color=blue><center>-------- ''If everything goes well, that should bring us to the Swing shift'' -------</font></center> | ||
**'''DC HV Scan, TOF Gain and ECAL Calibrations''': | **'''DC HV Scan, TOF Gain and ECAL Calibrations''': | ||
+ | *** ''All runs will be taken with the '''TBD''' inbending e- trigger without DC-roads until the trigger roads are validated by the trigger team''. | ||
***Ask MCC for 45 nA beam current and take 5 hours runs with different DC HV settings. A total of 120 M electron triggers is needed for this study. '''Florian needs to be consulted'''. (<font color=red>''I can't access Florian's table in Nathan's shared RG-D Special Runs document. Please, Florian, advise what needs to be specified here!''</font>) | ***Ask MCC for 45 nA beam current and take 5 hours runs with different DC HV settings. A total of 120 M electron triggers is needed for this study. '''Florian needs to be consulted'''. (<font color=red>''I can't access Florian's table in Nathan's shared RG-D Special Runs document. Please, Florian, advise what needs to be specified here!''</font>) | ||
*** Parasitically, 50 M electron triggers are needed for the TOF gain calibration <font color=red>''Please, Daniel, advise whether you need to be contacted for any specific setup for this run!''</font>) | *** Parasitically, 50 M electron triggers are needed for the TOF gain calibration <font color=red>''Please, Daniel, advise whether you need to be contacted for any specific setup for this run!''</font>) | ||
*** Parasitically, the same data can be used to conduct a linearity study for the new ECAL sector 5 PMTs. '''Cole needs to be consulted'''. (<font color=red>'' Please, Cole, advise what needs to be specified here!''</font>) | *** Parasitically, the same data can be used to conduct a linearity study for the new ECAL sector 5 PMTs. '''Cole needs to be consulted'''. (<font color=red>'' Please, Cole, advise what needs to be specified here!''</font>) | ||
+ | ** '''Coarse Luminosity Scan''': | ||
+ | *** This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents: | ||
+ | **** Ask MCC for 5 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. The randoms prescale factor needs to be decreased. <font color=red>''Who should be notified about that and for which beam current value it should increase back> </font>; <font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> | ||
+ | * '''Saturday, Sept. 16th''': | ||
+ | ** '''Luminosity Scan''': | ||
+ | *** Continue the study with the following beam currents: | ||
+ | **** Ask MCC for 10 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ||
+ | **** Ask MCC for 25 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ||
+ | **** Ask MCC for 35 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ||
+ | **** Ask MCC for 50 nA and take a 5 M run with the '''TBD''' inbending e- trigger with no-DC-roads. | ||
+ | |||
<!-- | <!-- |
Revision as of 13:57, 8 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 15:30: CH Room 200C, and on Zoom: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
LE: Please don't change: Work in progress
Short-Term Schedule for the Week from Sept 13th to Sept. 20th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C
Harp Scan References from RG-C |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|