Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 84: | Line 84: | ||
**** Ask MCC for 130 nA and take a 5 M triggers run. | **** Ask MCC for 130 nA and take a 5 M triggers run. | ||
**** Ask MCC for 150 nA and take a 5 M triggers run. | **** Ask MCC for 150 nA and take a 5 M triggers run. | ||
− | **Once done, ask for 130 nA and take 100 M runs of Cu+Sn until the end of the shift with the same electron trigger without DC roads: | + | **Once done, ask for 130 nA and take 100 M electron triggers runs of Cu+Sn until the end of the shift with the same electron trigger without DC roads: |
*** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | *** ''Trigger file'': '''rgd_250MeV_v1.0_no_DC.trg'''. | ||
<!--font color=blue><center>---''If everything goes well, the Owl shift should start somewhere in between the listed Cu+Sn luminosity scan runs!'' ---</font></center--> | <!--font color=blue><center>---''If everything goes well, the Owl shift should start somewhere in between the listed Cu+Sn luminosity scan runs!'' ---</font></center--> | ||
Line 93: | Line 93: | ||
** By the beginning of the swing shift, change the target configuration to C+C, then ask MCC for 30 nA and take at least 6h of 100 M runs. | ** By the beginning of the swing shift, change the target configuration to C+C, then ask MCC for 30 nA and take at least 6h of 100 M runs. | ||
** ''Plans may change'' but assuming the MCC MD will be on Monday, Sept. 25th (''similarly to the week of Sept 11th MD''), we should check with Denny/target group when they can come in to move the target back to LD2 position. The target won't be filled for the alignment run. <font color=red>Eugene may need to be contacted to ramp down the torus and solenoid magnets. </font> | ** ''Plans may change'' but assuming the MCC MD will be on Monday, Sept. 25th (''similarly to the week of Sept 11th MD''), we should check with Denny/target group when they can come in to move the target back to LD2 position. The target won't be filled for the alignment run. <font color=red>Eugene may need to be contacted to ramp down the torus and solenoid magnets. </font> | ||
− | ** Ask for 1 nA, and take 10 M electron triggers run with zero-field and the following electron trigger based on CTOFxCND coincidence | + | ** Ask for 1 nA, and take 10 M electron triggers run with zero-field and the following electron trigger file based on CTOFxCND coincidence with no-DC-roads: |
*** ''Trigger file'': '''rgd_250MeV_v1.0_zero.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | *** ''Trigger file'': '''rgd_250MeV_v1.0_zero.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
<!--font color=red> Please, Yuri, advise whether you need to be contacted to set anything for the parasitic CVT alignment </font--> | <!--font color=red> Please, Yuri, advise whether you need to be contacted to set anything for the parasitic CVT alignment </font--> |
Revision as of 13:53, 13 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting: Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 22nd to Sept. 25th, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|