− | == '''Run Plan for''' '''Sept. | + | == '''Run Plan for''' '''Sept. 29th to Oct. 2nd''', 2023 == |
* '''All shifts are canceled until Friday, Sept. 22nd, due to the target work delay'''. | * '''All shifts are canceled until Friday, Sept. 22nd, due to the target work delay'''. | ||
− | * '''Thursday, Sept. | + | * '''Thursday, Sept. 28th''': The tentative plan if everything progresses well with the target work is to lock up the hall in the day shift and start tunning the beam to the tagger dump in the swing/owl shift. |
− | * '''Friday, Sept. | + | * '''Friday, Sept. 29th''': |
** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Moller run with a new quadrupole power supply and tagger ramping/degaussing. '''Eugene plans to be present as the beamline expert'''. | ** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Moller run with a new quadrupole power supply and tagger ramping/degaussing. '''Eugene plans to be present as the beamline expert'''. | ||
** Start tuning beam to Faraday cup. It may take 2.5 hours to ramp up the solenoid and torus to full current. The solenoid will be gradually ramped up to half field intensity, then full, then the torus will be turned on and ramped up to full inbending current. During this process, keep an eye on the deflection at the viewer. '''Eugene plans to be present as the beamline expert'''. | ** Start tuning beam to Faraday cup. It may take 2.5 hours to ramp up the solenoid and torus to full current. The solenoid will be gradually ramped up to half field intensity, then full, then the torus will be turned on and ramped up to full inbending current. During this process, keep an eye on the deflection at the viewer. '''Eugene plans to be present as the beamline expert'''. | ||
Line 58: | Line 58: | ||
***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ||
**** Ask MCC for 5 nA and take a 5 M triggers run. <font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> | **** Ask MCC for 5 nA and take a 5 M triggers run. <font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> | ||
− | * '''Saturday, Sept. | + | * '''Saturday, Sept. 30th''': |
** '''Luminosity Scan''': | ** '''Luminosity Scan''': | ||
*** Continue the study for the following beam currents and the same electron trigger without DC roads: | *** Continue the study for the following beam currents and the same electron trigger without DC roads: | ||
Line 103: | Line 103: | ||
***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ***** ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ||
<!--font color=blue><center>---''If everything goes well, the Owl shift should start somewhere in between the listed '''CuSn''' luminosity scan runs!'' ---</font></center--> | <!--font color=blue><center>---''If everything goes well, the Owl shift should start somewhere in between the listed '''CuSn''' luminosity scan runs!'' ---</font></center--> | ||
− | * ''' | + | * '''Oct. 1st''': |
** Continue '''CuSn''' data-taking with 130 nA and 100 M triggers runs until the end of the Owl shift. | ** Continue '''CuSn''' data-taking with 130 nA and 100 M triggers runs until the end of the Owl shift. | ||
** Continue '''CuSn''' data-taking with 130 nA and 100 M triggers runs until the end of the Day shift. | ** Continue '''CuSn''' data-taking with 130 nA and 100 M triggers runs until the end of the Day shift. | ||
Line 111: | Line 111: | ||
*** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | *** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
**** ''Trigger file'': '''rgd_v1.0_zero.trg'''. | **** ''Trigger file'': '''rgd_v1.0_zero.trg'''. | ||
− | * '''Monday, | + | * '''Monday, Oct. 2nd''': |
** MCC maintenance/beam studies during the day shift (''TBC'')! | ** MCC maintenance/beam studies during the day shift (''TBC'')! | ||
** After establishing the beam in the swing shift on the outbending configuration, take first a Moller run. | ** After establishing the beam in the swing shift on the outbending configuration, take first a Moller run. |
Revision as of 09:42, 18 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00: CH Room 200C, and on ZOOM, except on Wednesdays, which is in ZOOM ONLY @ 15:30 due to the conflict with the 1:30 PM MCC meeting
ZOOM Link, Meeting ID: 1611984219, Passcode: RGD-RC23
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 29th to Oct. 2nd, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|