Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 29: | Line 29: | ||
== '''Run Plan for''' '''Sept. 29th to Oct. 2nd''', 2023 == | == '''Run Plan for''' '''Sept. 29th to Oct. 2nd''', 2023 == | ||
− | * '''All shifts are canceled until Friday, Sept. 29th, due to the target work delay''' | + | * '''All shifts are canceled until Friday, Sept. 29th, Day/Swing shift due to the target work delay'''. |
− | |||
* '''Friday, Sept. 29th''': | * '''Friday, Sept. 29th''': | ||
** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Moller run with a new quadrupole power supply and tagger ramping/degaussing. '''Eugene plans to be present as the beamline expert'''. | ** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Moller run with a new quadrupole power supply and tagger ramping/degaussing. '''Eugene plans to be present as the beamline expert'''. |
Revision as of 08:59, 29 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 29th to Oct. 2nd, 2023
DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|