Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 31: | Line 31: | ||
* '''All shifts are canceled until Friday, Sept. 29th, Day/Swing shift due to the target work delay'''. | * '''All shifts are canceled until Friday, Sept. 29th, Day/Swing shift due to the target work delay'''. | ||
* '''Friday, Sept. 29th''': | * '''Friday, Sept. 29th''': | ||
− | ** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour | + | ** If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Møller run with a new quadrupole power supply and tagger ramping/degaussing. '''Eugene plans to be present as the beamline expert'''. |
** Start tuning beam to Faraday cup. It may take 2.5 hours to ramp up the solenoid and torus to full current. The solenoid will be gradually ramped up to half field intensity, then full, then the torus will be turned on and ramped up to full inbending current. During this process, keep an eye on the deflection at the viewer. '''Eugene plans to be present as the beamline expert'''. | ** Start tuning beam to Faraday cup. It may take 2.5 hours to ramp up the solenoid and torus to full current. The solenoid will be gradually ramped up to half field intensity, then full, then the torus will be turned on and ramped up to full inbending current. During this process, keep an eye on the deflection at the viewer. '''Eugene plans to be present as the beamline expert'''. | ||
** '''Trigger validation''': | ** '''Trigger validation''': | ||
Line 122: | Line 122: | ||
**** ''Trigger file'': '''rgd_v1.0_zero.trg'''.</font><font color=blue><center>-----''If everything goes well, that should bring us to the Day shift'' -----</font></center> | **** ''Trigger file'': '''rgd_v1.0_zero.trg'''.</font><font color=blue><center>-----''If everything goes well, that should bring us to the Day shift'' -----</font></center> | ||
** MCC maintenance/beam studies during the day shift (''TBC'')! | ** MCC maintenance/beam studies during the day shift (''TBC'')! | ||
− | ** After establishing the beam in the swing shift on the outbending configuration, take first a | + | ** After establishing the beam in the swing shift on the outbending configuration, take first a Møller run. |
** Take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request: | ** Take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request: | ||
*** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | *** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
Revision as of 13:50, 29 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shift takers, please:
- Read the logbook, be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages; look over them every shift
- Follow the expert/worker shift instructions
- Communicate with your co-shift person
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Sept. 29th to Oct. 2nd, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|