Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 13: | Line 13: | ||
* '''Remote shift:''' If needed, worker shifts can be taken from off-site. Inform the '''PDL''' and '''RC'''. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up! | * '''Remote shift:''' If needed, worker shifts can be taken from off-site. Inform the '''PDL''' and '''RC'''. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up! | ||
− | Note to shift takers, please: | + | * Note to shift takers, please: |
− | + | :◊ Read the '''logbook''', be aware of previous 24 hours | |
− | + | :◊ Arrive at least 10 minutes early for '''shift change''' | |
− | + | :◊ Refresh the run wiki pages; look over them every shift | |
− | + | ::- Follow the '''expert/worker shift instructions''' | |
− | + | :◊ '''Communicate''' with your co-shift person | |
− | + | ::- The shift expert should know about and refer to logbook entries in their shift summary | |
− | + | ::- The shift worker should discuss an issue with the shift expert before making extra logbook entries | |
<!--font color=red>'''LE: Please don't change: Work in progress ''' </font--> | <!--font color=red>'''LE: Please don't change: Work in progress ''' </font--> | ||
Line 28: | Line 28: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Run Plan for''' ''' | + | == '''Run Plan for''' '''Oct. 2nd to Oct. 4th''', 2023 == |
− | * '''All shifts are canceled until | + | * '''All shifts are canceled until Monday, Oct. 2nd, Day shift due to the target work delay'''. |
− | * ''' | + | * '''Oct. 2nd''': |
− | + | :• If the beam is successfully tuned overnight to the tagger dump, take a 1.5-hour Møller run with a new quadrupole power supply and tagger ramping/degaussing. '''Eugene plans to be present as the beamline expert'''. | |
− | + | :• Start tuning beam to Faraday cup. It may take 2.5 hours to ramp up the solenoid and torus to full current. The solenoid will be gradually ramped up to half field intensity, then full, then the torus will be turned on and ramped up to full inbending current. During this process, keep an eye on the deflection at the viewer. '''Eugene plans to be present as the beamline expert'''. | |
− | + | :• '''Trigger validation''': | |
− | + | ::‡ The trigger experts, Valery and Rafo, need to be notified before starting this run. Then, call MCC, ask for 35 nA, and take a 4-hour-long (''read the N.B. below'') LD2 target run with a ''30 kHz random trigger'' to validate the electron trigger. ''Please note that a 4-h-long run is needed while the BEAM is ON; thus, adjust the end-of-run accordingly to account for any beam trips and hiccups'': | |
− | + | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_30kHz.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | |
− | + | ::‡ ''N.B.'': We need to test during this run a different BMT config; thus, after taking ''beam-on-data for 3h45min'', the SVT/MVT experts will load a new BMT configuration with 16 samples, ''then start a new random trigger run to complete the remaining 15-min-BEAM-ON-data with such a configuration''. The SVT/MVT experts, Yuri and Rafo, need to be called (''at least 30 min in advance'') while approaching the 3h45min end-of-run to be ready to reconfigure their BMTs. | |
− | + | ::‡ '''P.S.: Before the random trigger run ends, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to prepare for their MVT bias, and SVT ADC threshold studies during the next one-hour-long LD2 run'''.<font color=blue><center>-------- ''If everything goes well, that should bring us to the Swing shift'' -------</font></center> | |
− | + | ::‡ The trigger experts, Valery and Rafo, need to be notified before starting this run. Take a one-hour-BEAM-ON LD2 run with ''no-DC-roads'' e- trigger @ 35 nA to validate the trigger roads. | |
− | + | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | |
− | + | :• '''DC HV Scan, TOF Gain and ECAL Calibrations''': | |
− | + | ::‡ ''All runs will be taken with the e- trigger with no-DC-roads until the trigger roads are validated by the trigger team.''. | |
− | + | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | |
− | + | ::‡ Ask MCC for 35 nA beam current and take a few LD2 runs with 4 DC HV settings. A total of 180 M electron triggers is needed for this study: two HV settings with 75 M each and the other two with 15 M each. More information can be found at [https://wiki.jlab.org/clas12-run/images/2/2a/DCplansRGD.pdf]. '''Florian needs to be called to change the DC HV and confirm the statistics needed'''. | |
− | + | ::‡ '''P.S.: During the DC HV scan runs, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to perform their CVT bias scans'''. | |
− | + | ::‡ '''Parasitically''', 75 M electron triggers are needed for the TOF gain calibration. | |
− | + | ::‡ '''Parasitically''', the same data can be used to conduct a linearity study for the new ECAL PMTs.<font color=blue><center>-------- ''If everything goes well, that should bring us to the Owl shift'' -------</font></center> | |
− | * ''' | + | * '''Tuesday, Oct. 3rd''': |
− | + | :• '''LD2 Luminosity Scan''': | |
− | + | ::◊ This first study is needed for TOF/ECAL linearity and AI training. A series of runs will be taken with the following beam currents and the specified trigger files but with the same DAQ configuration: | |
− | + | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_5nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | |
− | + | ::‡ '''P.S.: Before starting each luminosity scan run, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | |
− | + | ::‡ Ask MCC for 5 nA and take a 5 M triggers run. | |
− | + | ::‡ Ask MCC for 20 nA and take a 5 M triggers run with the following trigger file: | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_20nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | |
− | + | ::‡ Ask MCC for 35 nA and take a 15 M triggers run with the following trigger file: | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | |
− | + | ::‡ Ask MCC for 50 nA and take a 15 M triggers run with the following trigger file: | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_50nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=blue><center>-------- ''If everything goes well, that should bring us to the Day shift''-------</font></center> | |
− | + | ::◊ Two high-current runs for AI training purposes: | |
− | + | :::‡ Ask MCC for 75 nA and take a 50 M triggers run with the following trigger file: | |
− | + | ::::- ''Trigger file'': '''rgd_v1.0_no_DC_90nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | |
− | + | :::‡ Ask MCC for 100 nA and take a 50 M triggers run with the following trigger file: | |
− | + | ::::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?), the beam current can be reduced to 90 nA or until the level that the trips cease! </font> | |
− | + | ::◊ '''Parasitically''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. '''Florian needs to be notified to be present in the CR during this run'''. | |
− | + | ::◊ '''Parasitically to the EPICS run''', perform a slow beam current ramps up for scaler linearity. That can be done over the phone with the MCC Ops using a 5 nA beam current increase steps until reaching 35 nA. The process should take 5 to 7 min at max. | |
− | + | ::◊ Once done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Day shift, but start performing the RICH Threshold scan as follows, assuming all other detectors are at their nominal settings, ''please check with the RC/AC'': | |
− | + | :::- Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_50.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run; | |
− | + | :::- Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_100.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run; | |
− | + | :::- Load the ''trigger file'': '''rgd_v1.0_no_DC_RICH_200.trg'''; <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>, and take a 100 M run;<font color=blue><center>-----''If everything goes well, the Swing shift should start somewhere in-between the RICH scan runs!'' -----</font></center> | |
− | + | ::◊ Whenever the RICH scan is done, continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the Swing shift but change the DAQ/trigger configuration to: | |
− | + | :::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift'' -----</font></center> | |
− | * ''' | + | * '''Wed., Oct. 4th''': |
− | + | <!--:• Continue LD2 data-taking with 35 nA and 100 M triggers runs until the end of the Owl shift with the same <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC.trg''' trigger file.--> | |
− | + | :• ''Plans may change,'' but assuming the MCC MD will be on Wed., Oct. 4th, <font color=Brown> please call Eugene to ramp down the torus and solenoid magnets as a preparation for the alignment run. </font> Also, the RC/Xiaodong should be notified ahead of time to boil off LD2 in parallel. | |
− | + | :• Once ready for the alignment run, ask MCC for 1 nA, and take 10 M electron triggers run (''keep an eye on the FD trigger rates to ensure that)'' with zero-field, empty target, and the following electron trigger file based on CTOFxCND coincidence with no-DC-roads: | |
− | + | ::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | |
− | + | ::- ''Trigger file'': '''rgd_v1.0_zero.trg'''.</font><font color=blue><center>-----''If everything goes well, that should bring us to the Day shift'' -----</font></center> | |
− | + | :• MCC maintenance/beam studies during the Day shift (''TBC'') in which the target position will be changed in the hall to a solid-target location. Both Denny and Xiaodong must be notified with this target change plan so Denny can perform it during the MD. However, the LD2 cell remains empty for the solid-foil runs! | |
− | + | :• After establishing the beam in the swing shift on the outbending configuration, take first a Møller run. | |
− | + | <!--:• '''Target Changeover''': | |
− | + | ::‡ Denny/Xiaodong needs to be called ahead of time (''at least 30 min in advance'') to ensure that the controlled access to change the target in the hall and boiling off LD2 will be done within 1/2h.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift'' ---</font></center> | |
− | + | ::‡ Once the access is done, put the flag assembly in the '''CxC''' target configuration, then ask MCC for 30 nA and take a 1/2h-BEAM-ON run as follows: | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
**** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | **** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | **** Ask MCC for 90 nA and take a 5 M triggers run with the following trigger file: | + | ***** ''Trigger file'': '''rgd_v1.0_no_DC_30nA.trg'''. --> |
− | + | :• '''Solid-target, CxC Configuration, Luminosity Scan''': | |
− | + | ::◊ '''P.S.: Before starting each luminosity scan run, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | |
− | + | ::‡ Ask MCC for 10 nA and take a 5 M triggers run with the following trigger file: | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_10nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | |
− | + | ::‡ We will scan three beam currents in this 5 M triggers run. Ask MCC for 20 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 30 nA for another 1.5 or 2 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 45 nA for the last 1.5 M events while ''monitoring the DC occupancy in mon12'', but with the following trigger file: | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_30nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | |
− | + | ::‡ ''Once done, take a 15 M run @ 30 nA with the same trigger file and DAQ configuration''. | |
− | + | ::‡ Next, we will scan much higher beam currents in the last 5 M triggers run with this target. Ask MCC for 50 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 75 nA for another 1.5 or 2 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 90 nA for another 1.5 M events while ''monitoring the DC occupancy in mon12'', but with the following trigger file: | |
− | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_50nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. <font color=brown>Depending on the detector's performance (HV trips?) during this run, the beam current can be reduced until the level at which the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan should stop or whether this last scan should be taken at a specific current value. </font> | |
− | + | ::‡ Depending on the stability of detectors in the last higher beam currents run, we can take a 25 M run @ 50 nA. | |
+ | :• Once done, ask for 30 nA (''check with RC/AC after Lumi. scan is done'') and take 100 M electron triggers runs with '''CxC''' target until the end of the Swing shift, but change the DAQ/trigger configuration to: | ||
+ | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ||
+ | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''-----</font></center> | ||
+ | * '''Thursday, Oct. 5th''': | ||
+ | :• Continue '''CxC''' data-taking with 30 nA (''TBD after Lumi. scan'') and 100 M triggers runs until the end of the Swing shift with the same <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC.trg''' trigger file.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ||
+ | :• '''Solid-target, CuSn Configuration, Luminosity Scan''': | ||
+ | ::‡ '''Thursday, Oct. 5th''': '''P.S.: Before starting each luminosity scan run, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to check the HV setting of MVT'''. | ||
+ | ::‡ Change the flag assembly setup to the '''CuSn''' target configuration and perform its luminosity scan with the specified trigger files but with the same DAQ configuration: | ||
+ | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
+ | ::‡ Ask MCC for 90 nA and take a 5 M triggers run with the following trigger file: | ||
+ | :::- ''Trigger file'': '''rgd_v1.0_no_DC_90nA.trg'''. | ||
+ | ::‡ We will scan three beam currents in this 5 M triggers run. Ask MCC for 110 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 120 nA, take another 1.5 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 130 nA for the last 2 M events while ''monitoring the DC occupancy in mon12'', but with the following trigger file: | ||
+ | :::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. | ||
+ | ::‡ ''Once done, take a 25 M run @ 130 nA with the same trigger file and DAQ configuration''. | ||
+ | ::‡ Next, we will scan much higher beam currents in the last 5 M triggers run with this target. Ask MCC for 150 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 175 nA for another 1.5 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 200 nA for the last 2 M events while ''monitoring the DC occupancy in mon12''.. <font color=brown>Depending on the detector's performance (HV trips?) during this run, the beam current can be reduced until the level at which the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan should stop or whether this last scan should be taken at a specific current value. </font> | ||
+ | ::‡ Depending on the stability of detectors in the last higher beam currents run, we can take a 25 M run @ 150 nA. | ||
+ | :• Once done, ask for 130 nA (''check with RC/AC after Lumi. scan is done'') and take 100 M electron triggers runs of '''CuSn''' until the end of the Day shift with the following configuration: | ||
+ | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ||
+ | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Swing shift''---</font></center> | ||
+ | :• Continue '''CuSn''' data-taking with 130 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Swing shift.<font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''----</font> | ||
+ | * '''Friday, Oct. 6th''': | ||
+ | :• Continue '''CuSn''' data-taking with 130 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Owl shift. </font> <font color=blue><center> ''If everything goes well, that should bring us to the Day shift'' -----</font></center> | ||
+ | :•<font color=Brown> Please call Eugene to change the torus polarity to an outbending configuration. In parallel, Denny/Xiaodong should be called so Denny will perform a controlled access to change the target back to the LD2 position while RC/Xiaodong will fill the LD2 cell. </font> | ||
+ | <!-- | ||
** ''Plans may change'' but assuming the MCC MD will be on Tuesday, Oct. 3rd, Denny/Xiaodong should be called ahead of time to ensure that the controlled access to change the target back to the LD2 position will be done within 1/2h, and the target will remain empty for the alignment run. | ** ''Plans may change'' but assuming the MCC MD will be on Tuesday, Oct. 3rd, Denny/Xiaodong should be called ahead of time to ensure that the controlled access to change the target back to the LD2 position will be done within 1/2h, and the target will remain empty for the alignment run. | ||
** In parallel, <font color=Brown> please call Eugene to ramp down the torus and solenoid magnets as a preparation for the alignment run. </font> | ** In parallel, <font color=Brown> please call Eugene to ramp down the torus and solenoid magnets as a preparation for the alignment run. </font> | ||
Line 120: | Line 129: | ||
** Once ready for the alignment run, ask MCC for 1 nA, and take 10 M electron triggers run (''keep an eye on the FD trigger rates to ensure that)'' with zero-field, empty target, and the following electron trigger file based on CTOFxCND coincidence with no-DC-roads: | ** Once ready for the alignment run, ask MCC for 1 nA, and take 10 M electron triggers run (''keep an eye on the FD trigger rates to ensure that)'' with zero-field, empty target, and the following electron trigger file based on CTOFxCND coincidence with no-DC-roads: | ||
*** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | *** ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
− | **** ''Trigger file'': '''rgd_v1.0_zero.trg'''.</font><font color=blue><center>----- | + | **** ''Trigger file'': '''rgd_v1.0_zero.trg'''.</font><font color=blue><center>----- |
** MCC maintenance/beam studies during the day shift (''TBC'')! | ** MCC maintenance/beam studies during the day shift (''TBC'')! | ||
− | ** After establishing the beam in the swing shift on the outbending configuration, take first a Møller run. | + | ** After establishing the beam in the swing shift on the outbending configuration, take first a Møller run.--> |
− | + | :• Once the torus in ramped up to the outbending setting, take another 50 M triggers run @ 35 nA with LD2 for the ECAL calibration upon Cole's request: | |
− | + | ::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | |
− | + | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | |
− | + | :• Once done, we will switch to production mode with outbending configuration: | |
− | + | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | |
− | + | ::- ''Trigger file'': '''rgd_out_v1.0.trg'''. | |
− | + | :• ''To-be-continued''.... | |
<!--** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''-->. | <!--** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''-->. | ||
<!-- | <!-- |
Revision as of 17:52, 30 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 2nd to Oct. 4th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|