Line 187: | Line 187: | ||
* Do not run more than 30 minutes above 90 nA with a 5-pass beam without the <b> beam blocker in front of the Faraday cup </b>. Put beam blocker in for long-running at high currents for 5-pass operations. | * Do not run more than 30 minutes above 90 nA with a 5-pass beam without the <b> beam blocker in front of the Faraday cup </b>. Put beam blocker in for long-running at high currents for 5-pass operations. | ||
* Turn <b> DC HV </b> off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. | * Turn <b> DC HV </b> off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. | ||
− | * For '''beam tuning and Møller runs''', please make sure the SVT/MVT are set as follows: '''SVT: LV ON; HV OFF''', and '''MVT: LV ON; HV ON in SAFE Mode''' | + | * For '''beam tuning and Møller runs''', please make sure the SVT/MVT are set as follows: '''SVT: LV ON; HV OFF''', and '''MVT: LV ON; HV ON in SAFE Mode.''' |
− | + | :◊ When '''turning MVT OFF''', do not press "BMT HV OFF" from HV->Overview->Actions, but instead '''select BMT HV ON - Safe Voltage'''. | |
− | + | :◊ When '''turning MVT ON''': '''go to HV->Overview->Actions, and select BMT HV ON - Full Voltage'''. | |
− | + | :◊ '''DO NOT start Production/Calibration/Various-Studies runs in the SAFE Mode'''. | |
* With any issue, contact On-Call Experts or RC - <b> do not spend more than 15-20 min trying to fix the problem</b>. If the phone is not answered, try the "Page Experts" button on top of CLASCSS. | * With any issue, contact On-Call Experts or RC - <b> do not spend more than 15-20 min trying to fix the problem</b>. If the phone is not answered, try the "Page Experts" button on top of CLASCSS. | ||
* Check for and read any comments to log-book entries made during your shift! | * Check for and read any comments to log-book entries made during your shift! | ||
Line 202: | Line 202: | ||
<!-- | <!-- | ||
* [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side. Run the script <font color=red>btaGet.py</font> to print you the correct BTA info for this hour -- edit the values on the BTA page if they are wrong!--> | * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to automatically fill the left side. Run the script <font color=red>btaGet.py</font> to print you the correct BTA info for this hour -- edit the values on the BTA page if they are wrong!--> | ||
− | * Upload spectra from clas12mon at the beginning and end of the shift and cross-check with reference spectra (make sure you select the SAME SECTOR for the reference plots on tabs with multiple sectors) | + | * Upload spectra from clas12mon at the beginning and end of the shift and cross-check with reference spectra (make sure you select the SAME SECTOR for the reference plots on tabs with multiple sectors); |
− | + | :◊ Reset clas12mon every ~2 hours and inspect spectra (some detectors have buttons at the bottom to toggle between the sectors -- please check all of them). | |
* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | * Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | ||
'''Every Run:''' | '''Every Run:''' | ||
− | *Check values at the start of every run and log screenshots of: | + | * Check values at the start of every run and log screenshots of: |
− | + | :◊ Main scaler GUI display | |
− | + | :◊ Trigger rate GUI | |
− | + | :◊ Beam strip charts | |
− | + | :◊ FTC scalers | |
* At the start and end of every run, check that the data filled in the [https://clasweb.jlab.org/rcdb database run list] is correct (especially fields that are filled in manually, like beam current and comments). This replaces the previously used spreadsheet. | * At the start and end of every run, check that the data filled in the [https://clasweb.jlab.org/rcdb database run list] is correct (especially fields that are filled in manually, like beam current and comments). This replaces the previously used spreadsheet. | ||
Revision as of 17:54, 30 September 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 2nd to Oct. 4th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-C (to-be-changed for RG-D)
Harp Scan References from RG-C (to-be-changed for RG-D) |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|