Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 28: | Line 28: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Run Plan for''' '''Oct. 4th to Oct. | + | == '''Run Plan for''' '''Oct. 4th to Oct. 8th''', 2023 == |
* '''Wednesday, Oct. 4th''': | * '''Wednesday, Oct. 4th''': | ||
:• '''Trigger validation''': '''Ongoing in the Day Shift''' | :• '''Trigger validation''': '''Ongoing in the Day Shift''' | ||
Line 95: | Line 95: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''-----</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''-----</font></center> | ||
− | * ''' | + | * '''Saturday, Oct. 7th''': |
:• Continue '''CxC''' data-taking with 30 nA (''TBD after Lumi. scan'') and 100 M triggers runs until the end of the Owl shift with the same <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC.trg''' trigger file.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | :• Continue '''CxC''' data-taking with 30 nA (''TBD after Lumi. scan'') and 100 M triggers runs until the end of the Owl shift with the same <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC.trg''' trigger file.<font color=blue><center>---''If everything goes well, that should bring us to the Day shift''---</font></center> | ||
:• '''Solid-target, CuSn Configuration, Luminosity Scan''': | :• '''Solid-target, CuSn Configuration, Luminosity Scan''': | ||
Line 112: | Line 112: | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Swing shift''---</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Swing shift''---</font></center> | ||
:• Continue '''CuSn''' data-taking with 125 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Swing shift.<font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''----</font> | :• Continue '''CuSn''' data-taking with 125 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Swing shift.<font color=blue><center>-----''If everything goes well, that should bring us to the Owl shift''----</font> | ||
− | * ''' | + | * '''Sunday, Oct. 8th''': |
:• Continue '''CuSn''' data-taking with 125 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Owl shift. </font> <font color=blue><center> -----''If everything goes well, that should bring us to the Day shift'' -----</font></center> | :• Continue '''CuSn''' data-taking with 125 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Owl shift. </font> <font color=blue><center> -----''If everything goes well, that should bring us to the Day shift'' -----</font></center> | ||
:•<font color=Brown> Please call Eugene to change the torus polarity to the outbending configuration. In parallel, Denny/Xiaodong should be called so Denny will perform a controlled access to move the target back to the LD2 position while the RC/Xiaodong will fill the LD2 cell. </font> | :•<font color=Brown> Please call Eugene to change the torus polarity to the outbending configuration. In parallel, Denny/Xiaodong should be called so Denny will perform a controlled access to move the target back to the LD2 position while the RC/Xiaodong will fill the LD2 cell. </font> |
Revision as of 13:11, 4 October 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 4th to Oct. 8th, 2023
P.S.: Both Denny and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|