::‡ ''All runs will be taken with the e- trigger with no-DC-roads until the trigger roads are validated by the trigger team.''. | ::‡ ''All runs will be taken with the e- trigger with no-DC-roads until the trigger roads are validated by the trigger team.''. | ||
:::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | ||
− | :::- ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>.''If everything goes well, that should bring us to the Owl shift'' -------</font></center> | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_35nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>.''If everything goes well, that should bring us to the Owl shift''-------</font></center> |
::‡ Ask MCC for 35 nA beam current and take a few LD2 runs with 4 DC HV settings. A total of 180 M electron triggers is needed for this study: two HV settings with 75 M each and the other two with 15 M each. More information can be found at [https://wiki.jlab.org/clas12-run/images/2/2a/DCplansRGD.pdf DC HV scan]. '''Florian needs to be called to change the DC HV after the first 75 M run with the default current setting (R1/R2/R3: 10/10/10 V; see the first table for HV study setting in [https://wiki.jlab.org/clas12-run/images/2/2a/DCplansRGD.pdf DC HV scan])'''. | ::‡ Ask MCC for 35 nA beam current and take a few LD2 runs with 4 DC HV settings. A total of 180 M electron triggers is needed for this study: two HV settings with 75 M each and the other two with 15 M each. More information can be found at [https://wiki.jlab.org/clas12-run/images/2/2a/DCplansRGD.pdf DC HV scan]. '''Florian needs to be called to change the DC HV after the first 75 M run with the default current setting (R1/R2/R3: 10/10/10 V; see the first table for HV study setting in [https://wiki.jlab.org/clas12-run/images/2/2a/DCplansRGD.pdf DC HV scan])'''. | ||
::‡ '''P.S.: During the DC HV scan runs, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to perform their CVT bias scans'''. | ::‡ '''P.S.: During the DC HV scan runs, please call (''at least 30 min in advance'') the SVT/MVT experts, Yuri and Rafo, to perform their CVT bias scans'''. | ||
::‡ '''Parasitically''', 75 M electron triggers are needed for the TOF gain calibration. | ::‡ '''Parasitically''', 75 M electron triggers are needed for the TOF gain calibration. | ||
::‡ '''Parasitically''', the same data can be used to conduct a linearity study for the new ECAL PMTs.<font color=blue><center>--------''If everything goes well, that should bring us to the Owl shift'' -----</font></center> | ::‡ '''Parasitically''', the same data can be used to conduct a linearity study for the new ECAL PMTs.<font color=blue><center>--------''If everything goes well, that should bring us to the Owl shift'' -----</font></center> | ||
− | :• Since the MCC Beam Studies is planned | + | * '''Thursday, Oct. 5th''': |
− | :• Once | + | :• Since the MCC Beam Studies is planned in the Day shift, <font color=Brown> please call ahead of time Eugene to ramp down the torus and solenoid magnets as a preparation for the alignment run. In parallel, the ''LD2 target needs to be emptied with a beam OFF''. Also, there is a plan for Yuri and Rafo to perform a controlled access for SVT and FMT crates power-cycling during this process. Please call them ''at least 30 min in advance'' to come in if they are not already in the CH. |
+ | :• Once the controlled access is done, and both magnets are ramped down, ask MCC for 1 nA, and take 10 M electron triggers run (''keep an eye on the FD trigger rates to ensure that)'' with zero-field, empty target, and the following electron trigger file based on CTOFxCND coincidence with no-DC-roads: | ||
::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
− | ::- ''Trigger file'': '''rgd_v1.0_zero.trg'''.</font><font color=blue><center>-----''If everything goes well, that should bring us to the Day shift'' -----</font></center> | + | ::- ''Trigger file'': '''rgd_v1.0_zero.trg'''.</font><font color=blue><center>-----''If everything goes well, that should bring us to the Day shift''-----</font></center> |
− | :• MCC | + | :• MCC beam studies during the Day shift! |
* '''Thursday Swing Shift, Oct. 5th''': | * '''Thursday Swing Shift, Oct. 5th''': | ||
:• '''LD2 Luminosity Scan''': | :• '''LD2 Luminosity Scan''': | ||
− | ::◊ After establishing the beam in the swing shift on the inbending configuration, take first a Møller run. | + | ::◊ After establishing the beam in the swing shift on the inbending configuration, take the first a Møller run. |
::◊ Next, perform a series of runs for TOF/ECAL linearity and AI training with the following beam currents and the specified trigger files but with the same DAQ configuration: | ::◊ Next, perform a series of runs for TOF/ECAL linearity and AI training with the following beam currents and the specified trigger files but with the same DAQ configuration: | ||
:::- ''DAQ Config.'': <tt>PROD66_PIN</tt> | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt> |
Revision as of 13:34, 4 October 2023
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 4th to Oct. 8th, 2023
P.S.: Both Denny and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|