Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 49: | Line 49: | ||
::‡ '''Parasitically (''Currently Ongoing by Florian'')''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. <font color=blue><center>-----''If everything goes well, the Swing shift should start somewhere in-between the LD2 Lumi. scans!'' -----</font></center> | ::‡ '''Parasitically (''Currently Ongoing by Florian'')''', a 1.5-hour run with just EPICS, no DAQ, can be taken in blocks in between the luminosity runs. List of points at [https://wiki.jlab.org/clas12-run/images/a/a8/RGD_DCHVEPICtesttable.pdf Overview Table]. <font color=blue><center>-----''If everything goes well, the Swing shift should start somewhere in-between the LD2 Lumi. scans!'' -----</font></center> | ||
* '''Friday, Oct. 6th, Swing Shift''': | * '''Friday, Oct. 6th, Swing Shift''': | ||
− | :• Once the Lumi. scan is done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Swing shift | + | :• Once the Lumi. scan is done, continue LD2 data-taking with 35 nA (''check with RC/AC after Lumi. scan is done''), and 100 M triggers runs until the end of the Swing shift |
− | + | ||
− | + | ''' P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel'''! | |
− | |||
− | ''' P.S.: Both | ||
::‡ Meanwhile, whenever the RICH scan is done, continue LD2 data-taking with 35 nA and 100 M triggers runs until they are ready for controlled access, but change the DAQ/trigger configuration to: | ::‡ Meanwhile, whenever the RICH scan is done, continue LD2 data-taking with 35 nA and 100 M triggers runs until they are ready for controlled access, but change the DAQ/trigger configuration to: | ||
:::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | :::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
Revision as of 13:00, 6 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 6th to Oct. 8th, 2023
P.S.: Both Engineering-on-call and Xiaodong must be notified ahead of time (at least 1/2h) to inform them about performing access to change the target position to the solid-foil position as well as emptying the target in parallel!
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|