Difference between revisions of "Template:ShortTermSchedule-RGD"
Line 31: | Line 31: | ||
* '''Friday, Oct. 6th, Swing Shift''': | * '''Friday, Oct. 6th, Swing Shift''': | ||
:• Once the Lumi. scan is done, take one LD2 run with 45 nA and 100 M triggers, but change the DAQ/trigger configuration to: | :• Once the Lumi. scan is done, take one LD2 run with 45 nA and 100 M triggers, but change the DAQ/trigger configuration to: | ||
− | ::- ''DAQ Config.'': <tt>PROD66_noRICH</tt>. <font color=blue> Follow the DAQ instructions below to change its | + | ::- ''DAQ Config.'': <tt>PROD66_noRICH</tt>. <font color=blue> Follow the DAQ instructions below to change its configuration.</font> |
:::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | :::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. | ||
:• Start the first 100 M run @ 50 nA with the same DAQ configuration and trigger file. | :• Start the first 100 M run @ 50 nA with the same DAQ configuration and trigger file. | ||
* '''Saturday, Oct. 7th, Owl Shift''': | * '''Saturday, Oct. 7th, Owl Shift''': | ||
− | :• Finish the first 100 M @ 50 nA, then | + | :• Finish the first 100 M @ 50 nA, then take another two 100 M runs with the same beam current, DAQ configuration, and trigger file. |
− | ''' P.S.: As the end of the | + | ''' P.S.: As the end of the last 50 nA run is approaching (at least one hour left), please call the engineering-on-call to inform him that we want to change the target position downstairs to solid target by the end of this run and thus we need him to come please for controlled access. Don't end the run even if it exceeds 100 M until the engineer comes. Please also call the AC, Lamiaa, after notifying the engineer. |
:• Once the access is done, Lamiaa will empty the target and call Eugene to help center the beam on the 2 solid-foil targets. | :• Once the access is done, Lamiaa will empty the target and call Eugene to help center the beam on the 2 solid-foil targets. | ||
:• '''Solid-target, CxC Configuration, Luminosity Scan''': | :• '''Solid-target, CxC Configuration, Luminosity Scan''': | ||
::◊ '''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | ::◊ '''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. Also, ''keep an eye on the DC occupancy on mon12 and refresh it frequently during the Lumi. scan runs''. | ||
::‡ Ask MCC for 10 nA and take a 5 M triggers run with the following configuration: | ::‡ Ask MCC for 10 nA and take a 5 M triggers run with the following configuration: | ||
− | :::- ''DAQ Config.'': <tt>PROD66_PIN_noRICH</tt>. <font color=blue> Follow the DAQ instructions below to change DAQ configuration and load a new trigger file</font>. | + | :::- ''DAQ Config.'': <tt>PROD66_PIN_noRICH</tt>. <font color=blue> Follow the DAQ instructions below to change the DAQ configuration and load a new trigger file</font>. |
:::- ''Trigger file'': '''rgd_v1.0_no_DC_10nA.trg'''. | :::- ''Trigger file'': '''rgd_v1.0_no_DC_10nA.trg'''. | ||
:‡ We will scan three beam currents in this 5 M triggers run. Ask MCC for 20 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 30 nA for another 1.5 or 2 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 45 nA for the last 1.5 M events while ''monitoring the DC occupancy in mon12'', but with the following trigger file: | :‡ We will scan three beam currents in this 5 M triggers run. Ask MCC for 20 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 30 nA for another 1.5 or 2 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 45 nA for the last 1.5 M events while ''monitoring the DC occupancy in mon12'', but with the following trigger file: |
Revision as of 20:47, 6 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
Run Plan for Oct. 6th to Oct. 8th, 2023
P.S.: As the end of the last 50 nA run is approaching (at least one hour left), please call the engineering-on-call to inform him that we want to change the target position downstairs to solid target by the end of this run and thus we need him to come please for controlled access. Don't end the run even if it exceeds 100 M until the engineer comes. Please also call the AC, Lamiaa, after notifying the engineer.
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|