== '''Run Plan for''' '''Oct. 7th to Oct. 8th''', 2023 == | == '''Run Plan for''' '''Oct. 7th to Oct. 8th''', 2023 == | ||
* '''Saturday, Oct. 7th, Day Shift''': | * '''Saturday, Oct. 7th, Day Shift''': | ||
− | :• Ask for 50 nA (''seems similar to LD2 @ 50 nA'') and take 100 M electron triggers runs with '''CxC''' target until | + | :• Ask for 50 nA (''seems similar to LD2 @ 50 nA'') and take 100 M electron triggers runs with '''CxC''' target until 2 PM, but change the DAQ/trigger configuration to: |
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ||
− | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''-----</font></center> | + | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. |
+ | :• After switching to CuSn configuration, we will center the target on the beam, then take two 10 M short runs with 2h01 y= +0.5 mm and y= 0 mm for comparison of DC occupancy, then proceed with quick lumi scans. <font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''-----</font></center> | ||
* '''Saturday, Oct. 7th, Swing Shift''': | * '''Saturday, Oct. 7th, Swing Shift''': | ||
− | |||
− | |||
:• '''Solid-target, CuSn Configuration, Luminosity Scan''': | :• '''Solid-target, CuSn Configuration, Luminosity Scan''': | ||
::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ||
::‡ The luminosity scan will be performed with the specified trigger files but with the same DAQ configuration: | ::‡ The luminosity scan will be performed with the specified trigger files but with the same DAQ configuration: | ||
:::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | ::‡ Ask MCC for | + | ::‡ We will scan three beam currents in this 5 M triggers run. Ask MCC for 110 nA, and take roughly 1.5 M events, ''monitor the DC occupancy in mon12 and log them'', then increase the current to 120 nA, take another 1.5 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 130 nA for the last 2 M events while ''monitoring and logging the DC occupancy in mon12'', but with the following trigger file: |
− | :::- ''Trigger file'': '''rgd_v1. | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''. <font color=blue> Follow the DAQ instructions below to load a new trigger file</font>. |
+ | ::‡ Next, we will scan much higher beam currents in the last 5 M triggers run with this target. Ask MCC for 150 nA, take roughly 1.5 M events, ''monitor the DC occupancy in mon12'', then increase the current to 175 nA for another 1.5 M events, ''refresh mon12 and monitor the DC occupancy'', and then increase the current to 200 nA for the last 2 M events while ''monitoring the DC occupancy in mon12''.. <font color=brown>Depending on the detector's performance (HV trips?) during this run, the beam current can be reduced until the level at which the trips cease. If approaching the current of the previously taken run, check with the RC or AC whether the luminosity scan should stop or whether this last scan should be taken at a specific current value. </font> | ||
+ | :• Once done, ask for 130 nA (''check with RC/AC after Lumi. scan is done''), keep the ''beam blocker in front of the Faraday cup'', and take 100 M electron triggers runs of '''CuSn''' until the end of the Swing shift with the following configuration: | ||
+ | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations</font>. | ||
+ | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''.<font color=blue><center>---''If everything goes well, that should bring us to the Owl shift''---</font></center> | ||
* '''Sunday, Oct. 7th, Owl Shift''': | * '''Sunday, Oct. 7th, Owl Shift''': | ||
− | :• '''Solid-target, CuSn Configuration, Luminosity Scan ( | + | :• Swit |
+ | |||
+ | * '''Sunday, Oct. 8th, Day Shift''': | ||
+ | :• '''Solid-target, CuSn Configuration, Luminosity Scan (cont'd)''': | ||
::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ::‡'''P.S.: Before starting each luminosity scan run, please call ''in advance'' the SVT/MVT experts, Yuri and Rafo ''at least 45 min and 30 min, respectively'', to check the HV setting of MVT'''. | ||
::‡ Continue the luminosity scan with the specified trigger files but with the same DAQ configuration: | ::‡ Continue the luminosity scan with the specified trigger files but with the same DAQ configuration: | ||
:::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | ::‡ | + | ::‡ Ask MCC for 90 nA and take a 5 M triggers run with the following Configuration: |
− | :::- '' | + | :::- ''DAQ Config.'': <tt>PROD66_PIN</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> |
− | ::‡ ''Once done, take a 25 M run @ 130 nA with the same | + | :::- ''Trigger file'': '''rgd_v1.0_no_DC_90nA.trg'''. |
− | + | ::‡ ''Once done, take a 25 M run @ 130 nA with the same DAQ configuration'' as well as the ''beam blocker. | |
− | ::‡ Depending on the stability of detectors in the last higher beam currents run, we can take a 25 M run @ 150 nA. | + | ::‡ Depending on the stability of detectors in the last CuSn higher beam currents run, we can take a 25 M run @ 150 nA. |
− | :• | + | :• Continue '''CxC''' data-taking with 50 nA and 100 M triggers runs with the same <tt>PROD66</tt> DAQ configuration and '''rgd_v1.0_no_DC.trg''' trigger file. Then, we will switch to CuSn target configuration. |
− | |||
− | |||
− | |||
:• Continue '''CuSn''' data-taking with 130 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Swing shift.<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font> | :• Continue '''CuSn''' data-taking with 130 nA (''TBD after Lumi. scan is done'') and 100 M triggers runs until the end of the Swing shift.<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font> | ||
* '''Sunday, Oct. 8th, Swing Shift''': | * '''Sunday, Oct. 8th, Swing Shift''': |
Revision as of 14:47, 7 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
Run Plan for Oct. 7th to Oct. 8th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|