Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 47: | Line 47: | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Owl shift''---</font></center> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Owl shift''---</font></center> | ||
* '''Tuesday, Oct. 10th, Owl Shift''': | * '''Tuesday, Oct. 10th, Owl Shift''': | ||
+ | :• Continue CuSn data-taking of 100 M production runs with 130 nA and the following DAQ and trigger configurations until the end of the Owl shift: | ||
+ | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> | ||
+ | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Owl shift''---</font></center> | ||
+ | * '''Tuesday, Oct. 10th, Day Shift''': | ||
:• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with CuSn target, then switch to the CxC target with beam OFF by changing the solid target from the drop-menu in the cryo-target GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]. Also, remove the beam blocker while the beam is OFF. | :• It depends on the status of the run from the previous shift; please continue the run until it reaches 100 M with CuSn target, then switch to the CxC target with beam OFF by changing the solid target from the drop-menu in the cryo-target GUI. For more details, please refer to the cryo-target and flag assembly: [https://docs.google.com/document/d/1kBNmLYg2gqa4XjWgMpbh0rBUxkSAupqdnMV4THepv7k/edit#heading=h.13kef88y2w8q manual]. Also, remove the beam blocker while the beam is OFF. | ||
:• Ask MCC for 50 nA, then take 100 M production runs with CxC until the end of the Owl shift with the following configuration: | :• Ask MCC for 50 nA, then take 100 M production runs with CxC until the end of the Owl shift with the following configuration: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations.</font> | ||
− | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the | + | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>---''If everything goes well, that should bring us to the Swing shift''---</font></center> |
− | |||
<!--:• ''To be continued and confirmed during the Day shift''! | <!--:• ''To be continued and confirmed during the Day shift''! | ||
:• In case 500 M triggers are already collected for each CuSn and CxC Target, we will flip the torus magnet polarity and change the target back to the LD2 position. | :• In case 500 M triggers are already collected for each CuSn and CxC Target, we will flip the torus magnet polarity and change the target back to the LD2 position. | ||
Line 63: | Line 66: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
::- ''Trigger file'': '''rgd_out_v1.0.trg'''.--> | ::- ''Trigger file'': '''rgd_out_v1.0.trg'''.--> | ||
+ | * '''Tuesday, Oct. 10th, Swing Shift''': | ||
:• ''To-be-continued'' | :• ''To-be-continued'' | ||
<!--** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>-->. | <!--** Once the access is done, please ask MCC for 165 nA and take 100 M triggers runs with an empty target for a couple of hours with the same <tt>PROD66</tt> DAQ configuration, but the following trigger file: ''Trigger file'': '''rgd_v1.0_no_DC_100nA.trg'''<font color=blue><center>-----''If everything goes well, that should bring us to the Swing shift''----</font>-->. |
Revision as of 20:51, 9 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
- ◊ For the required controlled access to change the LD2 and solid targets position down in the hall, please refer to this logbook entry #: 419613 for its requirement.
- ◊ Do NOT change FSD settings without approval from RC or beamline expert!
Run Plan for Oct. 9th to Oct. 10th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|