Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 47: | Line 47: | ||
* '''Thursday, Oct. 12th, All Shifts''': | * '''Thursday, Oct. 12th, All Shifts''': | ||
:• Continue LD2 outbending production with 50 nA by taking 100 M runs with the following configuration: | :• Continue LD2 outbending production with 50 nA by taking 100 M runs with the following configuration: | ||
− | ::- ''DAQ Config.'': <tt> | + | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> |
− | ::- ''Trigger file'': ''' | + | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. |
* '''Friday, Oct. 13th, Owl Shift''': | * '''Friday, Oct. 13th, Owl Shift''': | ||
:• Continue LD2 outbending production with 50 nA by taking 100 M runs with the following configuration: | :• Continue LD2 outbending production with 50 nA by taking 100 M runs with the following configuration: | ||
− | ::- ''DAQ Config.'': <tt> | + | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to load new trigger file.</font> |
::- ''Trigger file'': '''rgd_out_v1.0.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Day shift''----</font> | ::- ''Trigger file'': '''rgd_out_v1.0.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Day shift''----</font> | ||
''' P.S.: At 7:30 AM, please call the engineering-on-call to inform him that we want to change the target position downstairs to the solid target position by the end of this run, and thus, we need him to come for controlled access. Don't end the run even if it exceeds 100 M until the engineer arrives'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Day shift''----</font></center> | ''' P.S.: At 7:30 AM, please call the engineering-on-call to inform him that we want to change the target position downstairs to the solid target position by the end of this run, and thus, we need him to come for controlled access. Don't end the run even if it exceeds 100 M until the engineer arrives'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Day shift''----</font></center> |
Revision as of 02:38, 11 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
- ◊ For the required controlled access to change the LD2 and solid targets position down in the hall, please refer to this logbook entry #: 419613 for its requirement.
- ◊ Do NOT change FSD settings without approval from RC or beamline expert!
Run Plan for Oct. 10th to Oct. 11th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|