Difference between revisions of "Template:ShortTermSchedule-RGD"
Jump to navigation
Jump to search
Line 29: | Line 29: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == '''Run Plan for''' '''Oct. | + | == '''Run Plan for''' '''Oct. 12th to Oct. 14th''', 2023 == |
− | * '''Thursday, Oct. 12th, | + | * '''Thursday, Oct. 12th, Swing Shift''': |
:• '''As soon as the MCC is ready to send the beam, please call Eugene'''. Please follow the steps to establish the beam to tagger dump, energize the tagger magnet, and take a harp scan in 2C21 and 2C24 using 5 nA beam current, then Eugene will take a Møller run with a 1/2-wave plate out. | :• '''As soon as the MCC is ready to send the beam, please call Eugene'''. Please follow the steps to establish the beam to tagger dump, energize the tagger magnet, and take a harp scan in 2C21 and 2C24 using 5 nA beam current, then Eugene will take a Møller run with a 1/2-wave plate out. | ||
:• Next, the collimator needs to be moved to a 20 mm position, mask beam halos, and send the beam to FC, then take a harp scan in 2H01 and compare their results with the reference one at the bottom of this page. | :• Next, the collimator needs to be moved to a 20 mm position, mask beam halos, and send the beam to FC, then take a harp scan in 2H01 and compare their results with the reference one at the bottom of this page. | ||
Line 39: | Line 39: | ||
::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ::- ''DAQ Config.'': <tt>PROD66</tt>. <font color=blue> Follow the DAQ instructions below to change its configurations and load new trigger files.</font> | ||
::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Swing/Owl shift''----</font> | ::- ''Trigger file'': '''rgd_v1.0_no_DC.trg'''. <font color=blue><center>-----''If everything goes well, that should bring us to the Swing/Owl shift''----</font> | ||
− | |||
− | |||
− | |||
− | |||
* '''Friday, Oct. 13th, Owl Shift''': | * '''Friday, Oct. 13th, Owl Shift''': | ||
:• Continue the LD2 outbending production with 50 nA and 100 M runs by using the following configuration: | :• Continue the LD2 outbending production with 50 nA and 100 M runs by using the following configuration: |
Revision as of 15:58, 12 October 2023
Run Coordinator: Susan Schadmand (757) 575-7540 (or 757-223-6213)
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC meeting.
Important Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
- Note to shift takers, please:
- ◊ Read the logbook, be aware of previous 24 hours
- ◊ Arrive at least 10 minutes early for shift change
- ◊ Refresh the run wiki pages; look over them every shift
- - Follow the expert/worker shift instructions
- ◊ Communicate with your co-shift person
- - The shift expert should know about and refer to logbook entries in their shift summary
- - The shift worker should discuss an issue with the shift expert before making extra logbook entries
- ◊ For advice, do not hesitate to call the RC first and foremost, day and night.
- ◊ For the required controlled access to change the LD2 and solid targets position down in the hall, please refer to this logbook entry #: 419613 for its requirement.
- ◊ Do NOT change FSD settings without approval from RC or beamline expert!
Run Plan for Oct. 12th to Oct. 14th, 2023
. DAQ configuration
Reference ValuesFSD Thresholds from RG-D
Harp Scan References from RG-D
IA for Q Asymmetry |
General Instructions:
Every Shift:
Every Run:
To access the Hall:
|